RFP QuestBeta
Awarded · ResultStage · contract

West Dorset District Council

Shire Hall Cost Consultant Services

Engineering & ArchitectureCPV 71000000
Value£24k
Awarded19 Aug 2015
Published24 Jul 2015
RegionSouth West
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£24ktotal contract value
median £95k
this tender£0£2.0m

This sits below the typical range for Engineering & Architecture contracts — a smaller, more accessible award. Based on 33,646 valued Engineering & Architecture tenders in our corpus.

The brief

Notice Summary: Cost consultant during the detailed design and site construction phase for the refurbishment and fitout of a Grade I listed building in central Dorchester, due to be completed in Autumn 2017.

Shire Hall, High West Street, Dorchester is a Grade 1 Listed building constructed between 1796 and 1800.

It contains the courtroom in which the Tolpuddle Martyrs were tried in 1834 & is a major monument to labour history.

Thomas Hardy became a magistrate in 1894 and it is understood that he sat in the Court where the events became the inspiration for some of his writing.

Shire Hall has been retained as a heritage asset by West Dorset District Council (WDDC) together with six operational parking spaces at the rear and pedestrian and vehicular access to the public highway.

WDDC has decided to convert the building into a heritage attraction.

The overall aims of the project are: • To convert the Shire Hall Dorchester to provide a heritage attraction which interprets the building and its history, including the old Crown Court and Cells • To interpret and help bring to life the events which occurred there including the Tolpuddle Martyrs Trial • To respect and conserve the historic fabric of the building • To provide interpretation, learning resources and facilities to enable the building and events to be appreciated without impinging on the historic character of the site • To relocate the Tourist Information Centre (TIC) for Dorchester to within the building • To provide disabled access to the building and interpretation • To ensure the operation of Shire Hall is financially sustainable Requirements of the Cost Consultant: Design Phase: To work with WDDC, the London Dorchester Committee Trust (LDCT) and the Design team To produce a full cost estimate.

The estimate should include all costs associated with both the Lead Designer’s tender drawings and specification in RIBA Stages 3 & 4 and the Exhibition Designer’s tender drawings and specification.

To provide cost advice throughout the detailed design stages to assist decision making on specification requirements.

To attend progress meetings when required.

Construction Phase: During RIBA Stages 5 & 6 to produce monthly valuations and to check them against the Main Contractor’s Valuations and agree a final version with the contractor for forwarding for payment by the Client.

To produce a final account at the end of the project agreed with the Main Contractor.

To attend monthly progress meetings.

Operational Phase: To assist the LDCT with the production of the management and maintenance plan for the building.

This will involve assisting in structuring a 10-year action plan for management and maintenance as an appendix to the conservation management plan in line with the policies in the conservation management plan and HLF guidance.

RETURN DATE FOR PQQ'S: 24/08/2015 AT MIDDAY

Key requirements

What the supplier must deliver

01

To convert the Shire Hall Dorchester

To convert the Shire Hall Dorchester to provide a heritage attraction which interprets the building and its history, including the old Crown Court and Cells.

02

To provide interpretation, learning resources and facilities

To provide interpretation, learning resources and facilities to enable the building and events to be appreciated without impinging on the historic character of the site.

03

To provide disabled access to the building

To provide disabled access to the building and interpretation.

04

To ensure the operation of Shire Hall

To ensure the operation of Shire Hall is financially sustainable.

05

The estimate should include all costs associated

The estimate should include all costs associated with both the Lead Designer’s tender drawings and specification in RIBA Stages 3 & 4 and the Exhibition Designer’s tender drawings and specification.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at West Dorset District Council, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
d9d25fb4-4508-4325-adaf-31b06e3c0b27
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
Sch 3220
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Engineering & Architecture

Scroll to explore the market network

West Dorset District Council’s tender network

Assembling the network…

Also open now

Similar open tenders

Civil and Structural Engineering Services Consultancy Framework

Heriot-Watt University

Closes 24 Aug 2026Engineering & Architecture
£250kValue

Quantity Surveyor Consultancy Services for The National Lottery Heritage Fund project Reimagining Margam Castle

Neath Port Talbot County Borough Council

Closes 8 Sept 2026Engineering & Architecture
£220kValue