RFP QuestBeta
Awarded · ResultStage · contract

University of Exeter

SMARTLINE Project - Sensor Installation, Maintenance and Removal

ConstructionCPV 45000000 45300000 50000000 50400000 50700000 50710000 51000000 51100000 51600000 51610000
Value£192k
Awarded6 Aug 2017
Published12 Nov 2017
RegionSouth West
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£192ktotal contract value
median £158k
this tender£0£6.5m

This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.

The brief

Scope of Work 14.

This tender consists of 14.1.

Becoming familiar with the installation requirements of the sensors / gateways 14.2.

Arranging installation appointments following the standard Coastline Housing process described in sections above 14.3.

Receiving, physically checking and managing stocks of pre-configured / labelled sensors 14.4.

Installing sensors, gateways and other devices in homes 14.5.

Ensuring the specified connectivity back to the Data Collection System is in place 14.6.

Confirming that the sensors are communicating with the Data Collection System and data is being collected, using the system provided.

14.7.

Re-visit houses during the maintenance period to maintain / replace equipment (including making the appointments with residents) in line with the Maintenance SLA requirements set out below.

14.8.

De-install all equipment by the end of the project period.

This may be on an 'as required' basis if home decided to withdraw from the project and/or at the end of the 2 year data collection period (see Project Timescale section) 14.9.

Maintain and communicate accurate records of all contacts with residents 14.10.

Maintain and communicate accurate records of all sensors, gateways and other equipment installed, maintained and de-installed.

14.11.

Collate equipment de-installed and handover to the project team at the end of the project 14.12.

Report on a monthly basis 14.13.

Produce an end-of-project report

Requirements

What the notice asks for

01

Re-visit houses during the maintenance period

Re-visit houses during the maintenance period to maintain / replace equipment (including making the appointments with residents) in line with the Maintenance SLA requirements set out below.

02

Maintain and communicate accurate records of all

Maintain and communicate accurate records of all contacts with residents.

03

Maintain and communicate accurate records of all

Maintain and communicate accurate records of all sensors, gateways and other equipment installed, maintained and de-installed.

Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at University of Exeter, and generate a go-to-market strategy from their news, accounts and people.

Sign up free to unlock buyer intelligence

Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.

Source & provenance
OCID
a0ea6254-5a9e-4cf1-a245-52facd916673
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
20171112123017-53042
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

This view needs WebGL, which this browser has turned off.

University of Exeter’s tender network

This view needs WebGL, which this browser has turned off.
Also open now

Similar open tenders

Repairs and Maintenance Service (RMS) - Energy Efficiency and Bungalow Improvements Project 2027 (CRN/2026/300)

Stoke-on-Trent City Council

Closes 8 Oct 2026Construction
£780kValue

Gas Meter Removal and Installations

Procurement Assist Limited c/o Integrated Facilities Management Bolton Ltd (iFM Bolton)

Closes 31 May 2029Construction
£100.0mValue