RFP QuestBeta
ClosedStage · contract

Sizewell C Limited

Instrumentation and Monitoring

Electrical EquipmentCPV 31000000 31600000 31680000 31682000 71000000 71300000 71310000 71313000
Value£40.0m
Deadline8 May 2026
Published29 Apr 2026
RegionUK-wide
Timeline
Published 29 Apr 2026ClosedCloses 8 May 2026
Contract value in context
£40.0mtotal contract value
median £94k
this tender£0£43.2m

This is a large award for Electrical Machinery & Apparatus — above three-quarters of comparable contracts. Based on 5,617 valued Electrical Machinery & Apparatus tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The scope of works for this package includes: • Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems • Data acquisition and telemetry for transmission to a Client owned database and visualisation platform (This package of work does not include provision of the database) • All instrumentation is expected to be battery or solar powered • Compliance with relevant industry standards and regulatory requirements • Joint Ventures/Alliances will be considered Packages of work area as follows: InSAR Satellite • Provision of historical data to cover the area of Sizewell B and Sizewell C. • Provision of multi-directional coverage and analysis of the Sizewell B and Sizewell C area until 2036 (period maybe extended).

Unit 1 and 2 Plastic Wall Monitoring • Commence September 2026, end June 2027 • Drilling of approx.

200nr installation boreholes to a depth of 55m below ground level • Installation of IPI, IPIX, VWP and GNSS positional location monitoring Unit 1 and 2 Retaining Walls • Commence September 2026, end January 2028. • Installation in void formers at 200nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Shafts and Tunnels • Commence May 2027, end December 2027. • Installation in void formers at 50nr locations • Installation of IPI, IPIX, strain gauges and GNSS positional location monitoring Backfill Specification • Commence September 2027, end January 2029. • Installation under main nuclear islands • Installation of horizontal Inclinometers/SAA, hydraulic settlement cells and extensometers Provision of Maintenance Team • Commence September 2026, end December 2036 (maybe extended. • Provision of maintenance services to ensure operation of installed instrumentation, maintaining solar and battery powered equipment. • Undertaking manual monitoring where necessary

Key requirements

What the supplier must deliver

01

Supply, installation, and commissioning of ground

Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems.

02

All instrumentation is expected to be battery

All instrumentation is expected to be battery or solar powered.

03

Provision of maintenance services to ensure operation

Provision of maintenance services to ensure operation of installed instrumentation, maintaining solar and battery powered equipment.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Sizewell C Limited, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
17bb5818-d6ec-4a70-96f9-1dab83a6538d
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4N111405726
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Electrical Machinery & Apparatus

Assembling the market network…

Sizewell C Limited’s tender network

Assembling the network…