Buyer
Sizewell C Limited
The tender notices in our corpus from Sizewell C Limited, newest first, read from Find a Tender and Contracts Finder. Each links to its own page and to the original.
- Notices in the corpus
- 47Counted in the corpus search index when this page was read, across every stage (forecast, tender, award, contract). The index is refreshed by the corpus, so the newest notices may be missing for a while.Counted at Sat 17 Oct 2026, 00:22 BST.
- Newest notice published
- 17 Aug 2026
- Buyer type
- OtherThe corpus’s classification from the buyer name, as supplied.
- Read the buyer’s published records, newest first.
- Separate planning, live opportunities and historical outcomes.
- Read the original lot, value basis and documents.
- Investigate relevance before authorising response work.
Which notices has this buyer published?
Open notices are live tenders and forecasts. All notices also include historical ones: awarded, closed or past their deadline.
- Tunnel Segment Production Monitoring System copySizewell C Limited · London, South West, South East · Published 17 Aug 2026This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facil£500,000Estimated value stated in the noticeHistorical · Contract
- Tunnel Segment Production Monitoring SystemSizewell C Limited · Any region · Published 12 Aug 2026This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facil£500,000Estimated value stated in the noticeHistorical · Contract
- Site Power HV/LV Electrical DesignSizewell C Limited · East of England · Published 10 Aug 2026The HV/ LV electrical design is essential to develop a robust and safe electrical distribution network within the Tunnel Launch Compound (TLC), the STP, SXB, SMT areas within the Temporary Construction Area (TCA) and the Ancillary Construction Area (ACA) to support tunnel construction at the SZC sit£100,000Estimated value stated in the noticeHistorical · Contract
- Tunnel Segment Production Monitoring SystemSizewell C Limited · London, South West, South East · Published 6 Aug 2026This project involves the manufacturing, transportation and installation of approximately 39000 precast concrete tunnel segments. The segments will be produced at Avonmouth tunnel precast factory, transported through a multi-modal logistics network (truck and train interfaces), stored across 4 facil£500,000Estimated value stated in the noticeHistorical · Contract
- Fire and Rescue ServicesSizewell C Limited · North East, East of England, Any region · Published 29 Apr 2026Sizewell C (SZC) requires a fully operational onsite Fire & Rescue Service (FRS) to meet NSL Licence Condition 11. According to the current Site Fire Risk Assessment owned by SZC Health & Safety, the firefighting capability (full provision) must be fully implemented and operational by end of£20,000,000Estimated value stated in the noticeHistorical · Contract
- Instrumentation and MonitoringSizewell C Limited · Any region · Published 29 Apr 2026The scope of works for this package includes: • Supply, installation, and commissioning of ground and ground-water monitoring instrumentation systems • Data acquisition and telemetry for transmission to a Client owned database and visualisation platform (This package of work do£40,000,000Estimated value stated in the noticeHistorical · Contract
- SZC - Waterproofing MaterialsSizewell C Limited · Any region · Published 14 Apr 2026The waterproofing package includes the supply of all materials, namely bonded and unbonded membranes, waterbar materials and accessories, which are assembled and installed to form a specific waterproofing system to meet the design requirements. Dependent on the waterproofing system used, the waterpr£5,000,000Estimated value stated in the noticeHistorical · Contract
- Sizewell C - HR Monitoring (CRX & Building) PackageSizewell C Limited · Any region · Published 27 Mar 2026Overview of Scope Supply and installation of the HR Monitoring System to the to CRX and Nuclear Island Building The EAU (containment monitoring) system is required to continuously monitor and assess the mechanical behaviour and integrity of the Reactor Building and in£5,000,000Estimated value stated in the noticeHistorical · Contract
- Sizewell C (CWA) - Reinforcement Cut & Bend Plant, Equipment and MachinerySizewell C Limited · East of England · Published 6 Nov 2025Sizewell C (CWA) is looking for establishing an onsite rebar cut & bend (C&B) facility. This onsite facility will process about 238,000t of reinforcement bar and coil for the project duration. The onsite facility will process the complex nuclear rebar requirements just in time£20,000,000Estimated value stated in the noticeHistorical · Contract
- SZC - Main Works Earthworks - Bulk ExcavationSizewell C Limited · Any region · Published 17 Oct 2025The scope of works for this package is the bulk excavation of made ground, alluvial material and crag sand from the Main Construction Area (MCA) and transportation to either the suitable material stockpiles or unsuitable material disposal areas within the Temporary Construction Area (TCA), to allow£250,000,000Framework ceiling or programme total, not a contract valueHistorical · Contract
- Accommodation Campus - Site Wide LogisticsSizewell C Limited · Any region · Published 28 Aug 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£10,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Site Wide temporary electrical, water distribution and safety infrastructureSizewell C Limited · Any region · Published 28 Aug 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£10,000,000Estimated value stated in the noticeHistorical · Contract
- The Procurement of Marine Shared Services SOP000-016Sizewell C Limited · Any region · Published 30 Jun 2025Sizewell C (SZC) are wishing to seek expressions of interested (EOI) from capable suppliers to deliver Marine Shared Services and works. Please note that this procurement opportunity will not be conducted as a LOT-based tender. We are seeking qualified suppliers to deli£70,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Amenity Buildings MEPSizewell C Limited · Any region · Published 19 Jun 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£10,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Accommodation Buildings MEPSizewell C Limited · Any region · Published 19 Jun 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£40,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Accommodation Buildings Passenger LiftSizewell C Limited · Any region · Published 19 Jun 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£1,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Amenity Building Passenger LiftSizewell C Limited · Any region · Published 19 Jun 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£500,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Campus site wide hard and soft landscapesSizewell C Limited · Any region · Published 19 Jun 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£30,000,000Estimated value stated in the noticeHistorical · Contract
- Emergency Response and medical treatment serviceSizewell C Limited · London, East of England, South East · Published 16 Jun 2025Sizewell C (SZC) a new nuclear power station under development in Suffolk, is a copy of Hinkley Point C (HPC). A success at HPC has been the implementation of a Nurse Led Occupational Health Service (Hinkley Health) accessible to everyone engaged in the construction of the HPC build. A similar Heal£10,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Amenity Building RoofingSizewell C Limited · Any region · Published 16 May 2025The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residential buildings containing the single living units, placed in a broadly east-to-west orientation. The below package of wo£5,000,000Estimated value stated in the noticeHistorical · Contract
- Fuel Supply and Fuel FacilitySizewell C Limited · Any region · Published 16 May 2025Regarding, the fuel procurement expression of interest raised previously on CompeteFor titled 'Sizewell C - Fuel Procurement', 'Sizewell C - Interim Fuel Supply', 'Fuel Supply' and 'Fuel Distribution Facility' will now all be superseded by this new Expression£40,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Amenity Building Facade/GlazingSizewell C Limited · Any region · Published 16 May 2025The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residential buildings containing the single living units, placed in a broadly east-to-west orientation. The below package of wo£2,500,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Accommodation Buildings FoundationsSizewell C Limited · Any region · Published 16 May 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£10,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Accommodation Buildings FacadeSizewell C Limited · Any region · Published 16 May 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£30,000,000Estimated value stated in the noticeHistorical · Contract
- Accommodation Campus - Accommodation Buildings Bathroom PodsSizewell C Limited · Any region · Published 16 May 2025There is a requirement on SizewellC (SZC) to construct the Accommodation Buildings as part of the main welfare Campus. The project aim is to provide an accommodation campus of single living quarters for 2,400 workers. The campus will be comprised of 16 three- and four-storey residenti£10,000,000Estimated value stated in the noticeHistorical · Contract
What has this buyer published most recently?
This preview follows the current page’s record order. It is a sample, not a complete history or a forecast.
- 01
Tunnel Segment Production Monitoring System copy
Estimated value stated in the notice
- 02
Tunnel Segment Production Monitoring System
Estimated value stated in the notice
- 03
Site Power HV/LV Electrical Design
Estimated value stated in the notice
- 04
Tunnel Segment Production Monitoring System
Estimated value stated in the notice
- 05
How should you check a record before using it?
Follow its notice page to the original publication, then read the current document and value basis.
A published amount may describe a contract, lot or framework ceiling. The wording beside each record states the basis supplied by the source.
Publications: Find a Tender and Contracts Finder.
- Open the linked tender page and its original publication, where recorded.
- Separate publication, award and response dates.
- Read the value basis; a framework ceiling is not money spent.
- Use the named organisation; do not merge a group parent by assumption.
How much time should you allow to review this page?
Multiply the visible record count by your own review time. Follow-up documents are extra work.
Plan this page’s review
25 records on this page × your minutes per record.
Five minutes is an illustration. Later pages and linked documents are additional work.
- First record5
- Remaining records on this page120
What should you investigate first?
Check the notice’s stage and scope before treating it as available work.
- Record01
Open one relevant notice
Keep its identifier and original publication together. - Context02
Separate invitation from outcome
Planning and award notices are not current invitations. - Evidence03
Read the current documents
Follow scope, lots and updates; resolve missing information through the buyer. - Decision04
Record why it matters
Keep facts separate from eligibility or future-demand assumptions. - Action05
Name a useful follow-up
Decide whether preparation work is justified.
An editorial review sequence, not a buyer timetable or predicted cycle.
What can you safely conclude from these records?
Use the facts each record states. A page of notices or awards does not establish market share, a win rate or future demand.
Review the recorded limitations below. Missing data stays missing, and organisations are linked only when the corpus supplies a page key.
- The corpus and this page are bounded views of published records.
- No organisation-wide spend or awarded-value total is calculated here.
- A named buyer link is not evidence of a wider group relationship.
- Past records do not establish the next opportunity’s date or value.
Where can you investigate next?
Use the guides to resolve the notice stage, framework or evidence question.
| Next record or guide | Purpose |
|---|---|
| Search Contracts Finder records | Understand the next part of the bid |
| Separate frameworks from contracts | Understand the next part of the bid |
| Check the invitation’s stage | Understand the next part of the bid |
| Check security evidence | Understand the next part of the bid |
The next decision needs a record someone can check.
What is the useful next action?
Open a relevant notice and establish whether there is work your team should investigate.
Keep the source, uncertainty and decision together.
Explore current and past tenders →- Locate a relevant published notice.
- Follow original documents and the stage.
- Resolve evidence and delivery questions.
- Keep a specific action and its reasons.
What are the limits of this record?
- Notices are linked to this buyer by a slug made from the buyer name on each notice. A notice that writes the name differently may be under another buyer, or none.
- Buyer type is the corpus's classification from the buyer name, not an official category.
Where was this record read?
- Buyer
- sizewell-c-limited
- Read at
- Sat 17 Oct 2026, 00:22 BST
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.