RFP QuestBeta
Awarded · ResultStage · contract

Unity Property Services limited

Refurbishment of Leeds media centre- Unity homes

Repair & MaintenanceCPV 50000000
Value£1.8m
Awarded3 Oct 2022
Published7 Dec 2022
RegionLondon
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£1.8mtotal contract value
median £130k
this tender£0£4.8m

This is a large award for Repair & Maintenance — above three-quarters of comparable contracts. Based on 15,278 valued Repair & Maintenance tenders in our corpus.

The brief

This call-off is from EN:procure DPS for Installation, Responsive Repair and Maintenance with OJEU reference:2019/S 187-453493.

Leeds Media Centre was last refurbished in 2001; all major installations and building components are therefore approximately 20 years old.

The building is operational and partially occupied by multiple tenants (renting on a flexible basis) but it is in need of refurbishment throughout.

Due to budget limitations and the presence of tenants, the works focus primarily on the building fabric and communal areas.

There will be minimal access required to occupied offices (for replacement windows for example).

Headline scope of works includes:  Removal of existing redundant plant from the roof, recovering the roof with a tapered insulation system  Renewal of existing rainwater goods  Removal and replacement of existing external building envelope components including windows and doors  Repairs to the external building envelope  Internal layout reconfiguration  Renewal of all sanitary fittings  Renewal of the kitchen facilities to first and second floors  Replacing the existing heating system  Replacing the existing ventilation system  Replacing the existing passenger lift  Alterations to existing building services installations including installation of some new ducted mechanical ventilation  Works required under the BREEAM refurbishment category including the provision for renewable energy solutions.

The completed upgrades must enable the building to achieve an EPC score of B.

Although we will be using a Design and Build Contract, the design and specifications have been worked up to an advanced level (reasonably beyond RIBA stage 3) and the Contractor will also have the ability to novate any members of the design team (Architects, Mechanical and Electrical designers, EPC / BREEAM assessor).

The project is part funded by the European Regional Development Fund (ERDF), Leeds City Council and Unity Enterprise.

The works must be completed by 30th June 2023 as this is the funding backstop date.

Key requirements

What the supplier must deliver

01

There will be minimal access required

There will be minimal access required to occupied offices (for replacement windows for example).

02

The completed upgrades must enable the building

The completed upgrades must enable the building to achieve an EPC score of B.

03

The works must be completed by 30th

The works must be completed by 30th June 2023 as this is the funding backstop date.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at Unity Property Services limited, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
2a6a7d89-e620-447b-8c93-ec3ec7261b7b
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
ENP001-DN619410-36485750
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Repair & Maintenance

Scroll to explore the market network

Unity Property Services limited’s tender network

Assembling the network…

Also open now

Similar open tenders

Partial Refurbishment of defects at Handforth Community Centre

Handforth Town Council

Closes 18 Sept 2026Construction
£230kValue

ng homes: Mechanical & Electrical Services Maintenance Contract

ng homes

Closes 10 Aug 2026Repair & Maintenance
Value not publishedValue