EcoSF4: NE Hub Eel Pass Improvement Programme, Development & Design
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits in the lower-middle of the Environment & Waste band — a mid-scale opportunity. Based on 11,894 valued Environment & Waste tenders in our corpus.
Objectives The objective of the project is to on behalf of the Environment Agency (the Contracting Authority) complete an optioneering study for each of the three sites to identify the preferred option for eel passage.
This should then be progressed to detailed design suitable for construction.
The eel pass design at each site should deliver the following objectives: • To provide long term safe passage of eels past the structure, and operate reliably during eel and elver migration periods • To provide an eel passage solution that can be safely constructed, operated, maintained and decommissioned; • Is cost-effectivecost-effective to maintain, accessible for cleaning and inspections, and allows for monthly checks without specialist knowledge • To provide an eel pass solution that is robust enough to withstand the hydraulic conditions and debris experienced at each structure. • To provide consideration of whole life costs and whole life carbon to support decision making in the determination of the preferred option • To meet the requirements set out in LIT 75351 AM TA Eel Pass, Fish Pass and Fish Counters Maintenance Instruction and Guide. • Non powered solutions are preferred; however, the Environment Agency will consider more innovative solutions for Houghton Weir.
What the supplier must deliver
This should then be progressed to detailed
This should then be progressed to detailed design suitable for construction.
The eel pass design at each site
The eel pass design at each site should deliver the following objectives:.
To provide long term safe passage
To provide long term safe passage of eels past the structure, and operate reliably during eel and elver migration periods.
To provide an eel passage solution
To provide an eel passage solution that can be safely constructed, operated, maintained and decommissioned;.
Is cost-effectivecost-effective to maintain, accessible for cleaning
Is cost-effectivecost-effective to maintain, accessible for cleaning and inspections, and allows for monthly checks without specialist knowledge.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Environment Agency, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 441a04e5-fdd9-465c-b1d3-155d95415d48
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- CF-0656600D8d000003VQwdEAG
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Environment & Waste
Environment Agency’s tender network
Assembling the network…