Rig Switch and Zeros Upgrade to the UoB Theatre
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits below the typical range for Medical Equipment & Pharmaceuticals contracts — a smaller, more accessible award. Based on 9,456 valued Medical Equipment & Pharmaceuticals tenders in our corpus.
Replacement of theatre mains disitributed power with controllable non-dim rig switches.
Supply and installation of programmable lighting control panels in downstage right wing, control room and dimmer room.
Additional Led compatible fixtures Mains replacement Rig Switches To disconnect and remove the existing mains board supplying the non-dim power to 36 outgoing ways within the theatre space.
Supply and install a new smaller mains board in the same location to provide power to the two new Rig Switches.
To supply and install 2No.
2410 MCB Non Dim Rig switches in a new location above the stage area and extend the existing cables from the 36 ways to this new location.
Power for the new Rig switches.
Additional Non Dim Outlets 0 From the new Rig switch dimmer noted above, connected to the spare 12 ways, supply and install 2No.
New 16amp supplies to the dimmer room area and 10No.
New 16amp outlets in a facility panel next to the Rig Switch.
Please note that the maximum power to these outlets will be 10amp as this is governed by the Rig Switch MCB's.
ZerOS Server and Button Stations To supply and install in the existing control room rack, 1No.
Zero 88 ZerOS 2048 channel server and connect to the existing lighting desk in the same room.
To also supply and install 1No.
2 Button Panel DSR, 1No 2 Button panel in the control room, 1No, ICAN Button Station in the dimmer room and 1No.
ICAN Button station in the control room, all cabled back to the new ZerOS server.
To also replace within their existing locations, 1No.
Zero 88 Gateway 8 and 2No.
Zero 88 Splitter 8's, removing the existing and replacing with new.
Installation of the described system are included, this also includes full commissioning, testing and training service.
All equipment is supplied with 1 year site warranty (details available on request).
What the supplier must deliver
Supply and installation of programmable lighting control
Supply and installation of programmable lighting control panels in downstage right wing, control room and dimmer room.
Supply and install a new smaller mains
Supply and install a new smaller mains board in the same location to provide power to the two new Rig Switches.
To supply and install 2No
To supply and install 2No.
From the new Rig switch dimmer noted
From the new Rig switch dimmer noted above, connected to the spare 12 ways, supply and install 2No.
To supply and install in the existing
To supply and install in the existing control room rack, 1No.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at University Of Bedfordshire, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 467cc711-8560-4c73-b367-ca0a32596ec5
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- 16/04/2021TW
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Medical Equipment & Pharmaceuticals
University Of Bedfordshire’s tender network
Assembling the network…