Automated People Mover (APM) Infrastructure
£154,000,000 — published in the notice, and more than 50× anything this buyer has previously awarded (their largest of 109 published awards is £150,000,000). Check it against the ITT pack before relying on it.
The procurement contact named on the official notice.
High Speed Two (HS2) Limited has published 139 notices across all categories, and 15% of its awards go to a supplier it has used before.
Which is the argument for getting on the list rather than winning this one. The incumbent is rarely the last winner — it is the roster. See the retention odds by category →
The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport.
An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network.
The APM network will consist of a maintenance facility and four stops detailed herein: I.
Interchange Station stop; II.
National Exhibition Centre stop; III.
Birmingham International Railway Station stop; and IV.
Birmingham Airport stop.
The APM has been designed as an elevated mass transit system, which will transport passengers between those stops detailed above.
The APM route will consist of a 2.3km long viaduct, four stops and a maintenance facility.
The Interchange Station Stop is at ground level and the three other stops and maintenance facility are on the viaduct (above ground level).
The route has several major crossings to navigate, such as the M42 motorway, the West Coast Main Line (WCML) and Pendigo Lake at the National Exhibition Centre (NEC) site.
The key design features of the APM Infrastructure include reinforced central concrete piers, weathered steel deck and escape walkway gratings throughout the entirety of the track.
To minimise impact to the existing developed site and public roads, the entire 2.3km route is on an elevated viaduct.
This is made up of a range of single and twin track at various points along the route to allow trains to pass each other.The piers range from 6 metres high to 14 metres, depending on the topography along the route.
In order to maintain a consistent level for the viaduct, the columns will need to vary in height.
The stops at Birmingham Airport and at Interchange Station will have a single platform face and the intermediate stops at the NEC and Birmingham International Railway Station have two platform faces.
The platforms vary from 36m to 40m long and all platforms are fully covered with canopies and have step free access.
The APM Infrastructure scope includes the detailed design and delivery of all piers, viaducts, APM stops, the APM maintenance facility as well as temporary works.
The APM Infrastructure Contractor will be the Principal Contractor for the works and will be responsible for managing the APM Systems Contractor as well as nominated HS2 Contractors during these works.
The APM Infrastructure Contractor will be responsible for managing all the interfaces and access for the works.
Further details on interfacing contractors will be provided in the Tender documentation for the APM Infrastructure procurement.
What the notice asks for
An Automated People Mover (APM) is required
An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network.
In order to maintain a consistent level
In order to maintain a consistent level for the viaduct, the columns will need to vary in height.
The APM Infrastructure Contractor will be
The APM Infrastructure Contractor will be the Principal Contractor for the works and will be responsible for managing the APM Systems Contractor as well as nominated HS2 Contractors during these works.
The APM Infrastructure Contractor will be responsible
The APM Infrastructure Contractor will be responsible for managing all the interfaces and access for the works.
Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.
Make the case to bid
Reveal who to approach at High Speed Two (HS2) Limited, and generate a go-to-market strategy from their news, accounts and people.
Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.
The full intelligence dossier
Our agent reads High Speed Two (HS2) Limited’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Five included while we’re in beta, and the agent asks before it spends on any paid step.
- OCID
- ocds-h6vhtk-0519dd
- Stage
- planning · planned
- Source
- Find a Tender
- Buyer ref
- 048677-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
High Speed Two (HS2) Limited’s tender network