This sits in the upper-middle of the Construction band — a substantial contract for the sector. Based on 64,002 valued Construction tenders in our corpus.
The existing retaining wall on the lower section of Beach Road is slipping down the coastal slope, which in turn is causing the carriageway to fail.
There is currently a 3T weight limit on the road as a result.
Therefore a new retaining structure is required to stop the road collapsing.
The works comprise of piling into the existing carriageway behind the existing wall, and installing ground anchors to tie the piles back to stable ground.
A new parapet wall is to be constructed along the top of the piled wall.
A new kerb line is to be laid behind the new wall and the carriageway resurfaced.
What the supplier must deliver
Therefore a new retaining structure is required
Therefore a new retaining structure is required to stop the road collapsing.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Torbay Council, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- d78de377-6c82-4a24-9023-24f1ad9f7eea
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- TORB001-DN500434-91441752
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Torbay Council’s tender network
Assembling the network…