Beaufort Road/Wallasey Bridge Road - Ped/Cycle Improvements
This is a contract result notice, not an open opportunity. Details from the official award data.
This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.
Wirral Council wish to engage a Contractor for works for works including: • All works as required to construct 1200m of shared cycleway-footway with associated soft and hard landscaping using high-quality public realm materials and street furniture. • The work includes the installation of a parallel/zebra crossing facility for both pedestrians and cyclists on Beaufort Road and a traffic island on Wallasey Bridge Road. • Programming of the works, liaison and co-ordination with Wirral Council staff, designated Peel representatives and/or agents (in accordance with protocols to be agreed with Wirral Council) and any affected property owners. • Site Clearance (removal of street furniture, vegetation, tree root systems) and removal of soft and hard verges including footways.
The required tree removal adjacent to the kerb line has already been carried out, however, the tree root systems are still present.
The tree removal plan has been provided so that contractors are fully aware of the locations of the root systems that will need to be removed as part of site clearance mentioned in the works information. • Removal of carriageway surfacing, kerbing and provision of new carriageway construction, PCC kerbing and edging. • Existing kerbs in good condition to remain and renew damaged kerbs as necessary. • New hard verge (footway) construction - paved and bitmac (inc tactile 'blister' and 'corduroy' type paving etc). • All works as required to undertake all soft verge and landscaping works identified, including: excavation, disposal of suitable / unsuitable material, imported fill, levelling and shaping works, tree / shrub planting and seeding. • The contractor is responsible for all planting for 3 seasons/years as per Vol 3 - specification and appendices.
What the supplier must deliver
All works as required to construct 1200m
All works as required to construct 1200m of shared cycleway-footway with associated soft and hard landscaping using high-quality public realm materials and street furniture.
The tree removal plan has been provided
The tree removal plan has been provided so that contractors are fully aware of the locations of the root systems that will need to be removed as part of site clearance mentioned in the works information.
All works as required to undertake all
All works as required to undertake all soft verge and landscaping works identified, including: excavation, disposal of suitable / unsuitable material, imported fill, levelling and shaping works, tree / shrub planting and seeding.
The contractor is responsible for all planting
The contractor is responsible for all planting for 3 seasons/years as per Vol 3.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Wirral Borough Council, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 1361d63a-cedc-41b8-9158-6be39c4584ea
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- WIRLC001-DN621765-39379607
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Wirral Borough Council’s tender network
Assembling the network…