Bolsover Safe and Warm Scheme
This is a contract result notice, not an open opportunity. Details from the official award data.
This project will see three of the sheltered accommodation blocks have a full refurbishment of the heating services, including refurbished plant rooms, new distribution pipework and heat emitters to flats and communal areas.
In addition Bolsover have decided to install Heat Interface units with integrated heat metering units connected via an MBus network back to a central data logger to provide for remote monitoring and billing (HIU's) to each flat, this will ensure compliance with the Heat Network (Metering and Billing) Regulations 2014 whilst reducing heating and hot water costs to the tenants.
The Tenderer shall be the principal contractor and Main contractor for the project which shall encompass the heating investment programme, renewal of MCW system mains distribution, a sprinkler installation to each property and commercial areas which shall be installed by a nominated specialist and a bathroom fit out programme that shall be by a contractor from a minor framework that Bolsover already have set up (details supplied with specification).
These works shall be carried out onsite at the same time as the above noted installation works.
The Tenderer must make allowance for the full coordination of works between the various Contractors, particularly with regard to ensuring the sprinkler installation can be installed to be compliant with BS 9251 and that his programme of works is co-ordinated each week for the phased installation in each apartment.
The Tenderer shall be advised that they are required to design, supply and install the project based on the material specification and specialist's advice.
To maintain continuity the consultants have carried out an outline design of the Plant rooms and installations with indicative sizes throughout including pipe sizes, radiators and main plant.
As the Council require to convert a further 11 Properties in a similar manner the manufacturers, suppliers and specialists are to be included in as the tender to enable easier future maintenance to be provided.
What the supplier must deliver
These works shall be carried out onsite
These works shall be carried out onsite at the same time as the above noted installation works.
The Tenderer must make allowance for
The Tenderer must make allowance for the full coordination of works between the various Contractors, particularly with regard to ensuring the sprinkler installation can be installed to be compliant with BS 9251 and that his programme of works is co-ordinated each week for the phased installation in each apartment.
The Tenderer shall be advised that they
The Tenderer shall be advised that they are required to design, supply and install the project based on the material specification and specialist's advice.
To maintain continuity the consultants have carried
To maintain continuity the consultants have carried out an outline design of the Plant rooms and installations with indicative sizes throughout including pipe sizes, radiators and main plant.
As the Council require to convert
As the Council require to convert a further 11 Properties in a similar manner the manufacturers, suppliers and specialists are to be included in as the tender to enable easier future maintenance to be provided.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at NOE-CPC, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 133e3300-1503-4726-ba80-424690ed2f83
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- CRH 01343/2
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
NOE-CPC’s tender network
Assembling the network…