SCS JV

Bridge Works

ConstructionCPV 45000000 45200000 45220000 45221000 44000000 44200000 44210000 44212000 71000000 71300000 71320000 71322000
Value£2.5m
Awarded16 Aug 2021
Published14 Jul 2022
RegionLondon
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£2.5mtotal contract value
median £158k
this tender£0£6.5m

This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.

The brief

High Speed 2 (HS2) is the new High-Speed Rail Network running between London in the South and Manchester and Leeds to the North.

Skanska Construction UK Ltd, Costain Ltd, STRABAG AG (SCS) have been awarded the two Main Works Civils Contracts (MWCC) - S1 and S2 tunnels.

S1 includes two 9 km twin bored tunnels between the new HS2 stations, Euston and Old Oak Common.

S2 continues from Old Oak Common with 15 km of twin bored tunnels to West Ruislip where there is approximately 5 km of open route before transitioning into C1 lot (managed by Others).

SCS's scope will include the full design of all Main Civil Works for the Lots S1 and S2 of HS2.

The Project is split down into three areas, Area East (Euston), Area Central (Old Oak Common) and Area West (West Ruislip).

This opportunity currently relates to works that will occur in Area West, which extends from West Ruislip to Old Oak Common, although there may be the possibility to extend the scope to cover Area Central and Area East at a later date once requirements have ascertained.

Buildings, bridges and other assets along the route of the tunnels need to be prepared for the tunnel boring machines (TBMs) to be driven through underground and remediated/repaired afterwards in the event of damage as a result of movement and the like.

The specific scope for this opportunity is: The provision of all management, supervision, labour, plant, materials, equipment and consumables (including fuels) necessary to carry out and complete the design, supply, delivery, installation, maintenance, testing and commissioning of the Bridge work consisting of: General Items: • Assessment and design of solutions for permanent works as may be required including associated drawings, calculations and P.I. insurance. • Design and provision of any necessary temporary works required including the associated drawings, calculations and P.I. insurance. • All necessary access provisions and equipment. • Coordination and integration with other trades and subcontractors to properly complete the works. • Necessary expertise, experience, assurances and approvals relating to working in Network Rail, London Underground and Highways environments. • Capability for the fabrication/manufacture of works off-site. • Assistance and support in the preparation for, and acquisition of, any required licenses, consents, approvals and permissions. • BIM capability is preferable although not critical.

Bridge Works includes: • Supply of the Hydraulic Jacking Frames and associated materials required to construct the approved design solution. • Installation of the Hydraulic Jacking Frame solution. • Commission, maintenance and removal of the hydraulic jacking frames. • Bearing(s) replacement. • Supply of the materials to construct the approved structural strengthening design solution. • Installation of the structural strengthening design solution. • Provision of input to provide assessment and production of the detailed design inclusive of relevant CAT2/CAT3 checks. • Production of detailed fabrication and shop drawings.

When selecting a supplier SCS look for alignment of values, behaviours and cultures, between ourselves and our supply chain.

SCS and HS2 have aligned their values to the following: * Safety * Integrity * Leadership * Respect Please refer to HS2 supplier guide. ( https://www.gov.uk/government/publications/hs2-supplier-guide) In order to achieve a successful project outcome we have published a manifesto of our guiding principles, which include: * Making HS2 affordable * Delivering on promises * We build with people in mind * Delivering more than a railway * Achieving more together * Creative and challenging Successfully shortlisted supplier's will be those with verifiable experience, the appropriate capability and resources to deliver the scope of works.

During this stage supplier's may then be invited to the project to formally demonstrate their experience and capabilities.

As an alternative phone/webinar interviews may be conducted.

Shortlisted suppliers will be sent a Prequalification Questionnaire (PQQ) request.

Suppliers successfully selected through the prequalification will be invited to provide a formal competitive tender for the services.

The Invitation to Tender (ITT) and final selection will be based upon a balanced scorecard, requiring suppliers to demonstrate their ability to work with the projects values and behaviours in mind, whilst proving their capabilities and competence, through qualitive and quantative evidence.

We are an unincorporated joint venture between Skanska, Costain and Strabag working on HS2 main works civil engineering contract for Section 1 and Section 2 of the planned HS2 route.

Not only have the individual companies delivered high speed rail, major infrastructure and some of the most iconic structures internationally, the joint venture also has a proven record of working together.

Skanska and Costain have a long history of successfully delivering civil engineering projects together in the UK, dating back 30 years.

In joint venture they have delivered many major infrastructure projects, including the M25 in the 1980s, High Speed 1 in the early 2000s and the current Crossrail endeavor coming to completion under the streets of London.

STRABAG and Skanska have worked together for over 15 years on European projects in Switzerland, Slovakia and Norway.

As a joint venture, we are bringing together our collective strength to deliver world-class engineering, contributing to the long term economic growth of local and international markets.

This is perfectly encapsulated in our mission; to draw everyone together to create a strong foundation from which to launch a transformative legacy.

Key requirements

What the supplier must deliver

01

Buildings, bridges and other assets along

Buildings, bridges and other assets along the route of the tunnels need to be prepared for the tunnel boring machines (TBMs) to be driven through underground and remediated/repaired afterwards in the event of damage as a result of movement and the like.

02

The provision of all management, supervision, labour

The provision of all management, supervision, labour, plant, materials, equipment and consumables (including fuels) necessary to carry out and complete the design, supply, delivery, installation, maintenance, testing and commissioning of the Bridge work consisting of:.

03

Coordination and integration with other trades

Coordination and integration with other trades and subcontractors to properly complete the works.

04

Assistance and support in the preparation

Assistance and support in the preparation for, and acquisition of, any required licenses, consents, approvals and permissions.

05

Supply of the Hydraulic Jacking Frames

Supply of the Hydraulic Jacking Frames and associated materials required to construct the approved design solution.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at SCS JV, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
7c6aaac4-5a90-428a-9120-9d3187276432
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4A57280947
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

SCS JV’s tender network

Assembling the network…

Also open now

Similar open tenders

Fire Compartmentation Works - Town Hall & Watermark

Ivybridge Town Council

Closes 10 Aug 2026Construction
Value not publishedValue

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 9 - B CAMP Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue