Newry, Mourne and Down District Council (NMD)
CA16825 - RFQ 2025/40 - Distribution Board Replacement and Lift Supply Installation - Greenbank Garage
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits below the typical range for Repair & Maintenance contracts — a smaller, more accessible award. Based on 15,278 valued Repair & Maintenance tenders in our corpus.
Two new vehicle lifts have been installed in Greenbank Garage Newry, Mourne and Down District Council, however these cannot currently be connected due to insufficient supply capacity.
Each lift requires a 32A 400V 3-phase supply, whereas the existing installation provides only a single 16A 400V outlet that previously servicing the old lift.
The existing distribution boards within the Garage contain spare ways, but the circuit breakers required to support new or modified circuits are now obsolete.
As such, replacement of the existing distribution boards and associated switchgear is required to facilitate the new lift supplies and to ensure compliance with current electrical standards.
The two vehicle lifts are the only items that are provided.
The rest of the materials are to be provided by the supplier.
Also al outstanding remedial items identified within the Electrical Installation Condition Report (EICR) To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA16825.
Not registered: Visit https://suppliers.multiquote.com then register and quote CA16825 as the reason for registration.
Any queries please contact MultiQuote on 0151 482 9230.
What the supplier must deliver
Two new vehicle lifts have been installed
Two new vehicle lifts have been installed in Greenbank Garage Newry, Mourne and Down District Council, however these cannot currently be connected due to insufficient supply capacity.
Each lift requires a 32A 400V 3-phase
Each lift requires a 32A 400V 3-phase supply, whereas the existing installation provides only a single 16A 400V outlet that previously servicing the old lift.
The existing distribution boards within the Garage
The existing distribution boards within the Garage contain spare ways, but the circuit breakers required to support new or modified circuits are now obsolete.
As such, replacement of the existing distribution
As such, replacement of the existing distribution boards and associated switchgear is required to facilitate the new lift supplies and to ensure compliance with current electrical standards.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Newry, Mourne and Down District Council (NMD), and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- a83c6c51-762c-406e-b707-0719e29d8fa5
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- cf902df3-a66e-4877-9781-3649e6794a11
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Repair & Maintenance
Newry, Mourne and Down District Council (NMD)’s tender network
Assembling the network…