Brighton & Hove City Council
BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor
This is a contract result notice, not an open opportunity. Details from the official award data.
This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.
Madeira Terrace is a well-known and much-loved Brighton and Hove Landmark.
At 865m long in total it is one of the longest cast-iron structures in the world and an admired piece of Victorian architecture, integral to the Eastern Seafront.
It is also a significant Grade 2* listed structure within the rich heritage context of the wider coastal city.
Phase 1 of the Madeira Terrace Restoration project encompasses 40nr arches sitting between the Royal Crescent steps and the Shelter Hall / Concord 2.
The cast iron structure forms a backbone describing the historic development of the seafront.
Addressing the sea and the beach firmly braced against the rising East Cliff wall rising behind.
It is a 'backdrop': designed and intended to be used and inhabited by the residents of the city for all manner of events and social occasions; for quiet enjoyment, outdoor exercise and for viewing.
The structure is now deemed unsafe and public access has not been possible for a number of years, due its condition.
The Phase 1 project includes the following elements of works: • Conservation and repair of the historic cast iron structure. • Conservation and management of the historic Japanese Spindle green wall [dating from 1872], and other planting associated with the Green Wall. • Repairs to the facing of the east cliff-wall (a designated highways structure) to ensure public safety; and re-presentation of its surface to visually unify and present a more attractive backdrop to the restored structure. • Public realm landscaping to both the terrace deck above and the promenade walkway below, including new hard surfacing, soft landscaping and street furniture. • Local improvement to Madeira Drive, via new pedestrian crossing points. • New lighting and servicing infrastructure • Repairs and upgrades to the existing lift mechanism within the Shelter Hall / Concorde 2 building, to allow its continued historic function as the original means of step-free access to the terrace. • A new external public lift
What the supplier must deliver
Repairs to the facing of the east
Repairs to the facing of the east cliff-wall (a designated highways structure) to ensure.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Brighton & Hove City Council, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- dac98280-6885-48ac-97ec-456174f7a918
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- BHCC - Madeira Terraces Restoration Phase 1 - Main Contractor
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Brighton & Hove City Council’s tender network
Assembling the network…
Similar open tenders
Tender for Phase 1 River Restoration Works on Ballymartrim River supported by PEACEPLUS CALM
Armagh City, Banbridge and Craigavon Borough Council
Ravensbury Main Works Phase 3A and 3B Option PSQ
Clarion Regeneration Limited