GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure
The procurement contact named on the official notice.
The submission route named on the official notice.
The Works The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots.
In summary, the Works under this Contract will comprise: • Necessary surveys, and investigations and monitoring. • Demolition of remaining buildings (including the existing Guildford Council Depot) • Vegetation clearance, tree felling and site strip • Topsoil stripping • Sitewide remediation of contamination (where required) • Site platform and levelling • Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors • Swales and attenuation basins • Surface water outfalls • Utility infrastructure, ducting, chambers, pipework • Highway formations • Signage, markings, street furniture, street lighting • Non-motorised Vehicles works, encompassing various pedestrian and cycle path improvements • S278 Junction Works • Maintain the reptile translocation fencing and associated inspections Location Location of Project: • Area named Phase 1: Weyside Urban Village (Slyfield regeneration Programme), Land to the south of Bellfield Allotments, Guildford, GU1 1QG. • Area named Phase 3: Weyside Urban Village (Slyfield regeneration Programme), existing Guildford Borough Council’s Depot site, Guildford GU1 1QE. • Area named NMU: Farm Close, Section 106 ref 6, Mangles Road Section 106 ref 10.4 and Towpath improvements section 106 ref 8-9 Works by Others During these works there are likely to be the following works being undertaken by the Employer and statutory undertakers on and or around the site, including but not limited to; • Ground water monitoring. • Other works may be occurring adjacent to the site on the wider master site plan. • Ecological watching brief by an independent ecologist • Archaeological watching brief by an independent archaeologist • Utilities works / diversions (which do not form part of the Scope of these works). • General s278 Highways works • Works associated with the relocation of the Sewerage Treatment Works • Off site demolitions
What the supplier must deliver
Maintain the reptile translocation fencing and associated
Maintain the reptile translocation fencing and associated inspections.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Guildford Borough Council, and generate a go-to-market strategy from their news, accounts and people.
The full intelligence dossier
Our agent reads Guildford Borough Council’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ocds-h6vhtk-065344
- Stage
- tender · Open
- Source
- Find a Tender
- Buyer ref
- 013141-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Guildford Borough Council’s tender network
Assembling the network…