RFP QuestBeta
Awarded · ResultStage · contract

Phoenix M E Ltd

HS2 - Westgate Lightning Protection (Sub-subcontract Package)

ConstructionCPV 45312310
Value£100k
Awarded30 Jun 2024
Published25 Jun 2024
RegionUK-wide
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£100ktotal contract value
median £158k
this tender£0£6.5m

This sits in the lower-middle of the Construction band — a mid-scale opportunity. Based on 64,002 valued Construction tenders in our corpus.

The brief

To undertakes the design, procurement, delivery, off-loading installation, testing, setting to work, commissioning, assurance, maintenance and handover of Westgate ventilation shaft lightning protection works as further described within this information To install a complete and compliant lightning protection installation in line with the project specifications including (but not limited to) the following: • Installation of earth tapes on the head house and connections to the earthing system as per the contract drawings and earthing schematics. • Installation of test pits and earthing rods as detailed in the design drawings. • Fixing of earth tapes and connections of tapes and cables as per design drawings • Connection to earthing networks / systems installed by others. • Any labelling required for tapes and cables • Testing of earth bars and cabling To undertake a lightning protection risk assessment in accordance with the requirements set out within BS EN 62305, the lighting protection risk assessment shall recognise the potentially high economic losses associated with the loss of the ventilation and intervention shaft or firefighting point.

To use conductor tapes, running down the exterior of the building to separate earth rods, in preference to using structural steelwork where practicable to minimise the risk to sensitive equipment.

To ensures that all cables running externally shall make as much use as practicable of natural shielding from fully bonded conducting materials.

To assesses the lightning protection system for the incorporation of air termination networks on the roof and identify that best composition.

To provide test joints for all down and earthing conductors and will be located in inspection pits adjacent to the above ground building foundations.

To install surge protection devices for all cables passing through the lightning protection system and be class I type where cables enter and leave the building at roof level, conforming to IC 61643-12.

To install class III type conforming to IC 61643-12 where cables enter and leave the building at ground level surge protection devices.

To provides suitable warranties in line with industry standards.

Key requirements

What the supplier must deliver

01

To undertake a lightning protection risk assessment

To undertake a lightning protection risk assessment in accordance with the requirements set out within BS EN 62305, the lighting protection risk assessment shall.

02

To ensures that all cables running externally

To ensures that all cables running externally shall make as much use as practicable of natural shielding from fully bonded conducting materials.

03

To provide test joints for all down

To provide test joints for all down and earthing conductors and will be located in inspection pits adjacent to the above ground building foundations.

Derived from the notice text — always confirm against the original documents.

The gates

What this notice demands of you

1 named in obligation language, 0 mentioned. Each one is quoted from the notice.

EN 62305 (lightning protection)says mustStandards the work must meet
To undertake a lightning protection risk assessment in accordance with the requirements set out within BS EN 62305, the lighting protection risk assessment shall

Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.

Buyer intelligence

Make the case to bid

Reveal who to approach at Phoenix M E Ltd, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
2ce81fef-0f95-42b3-99fd-846f8676131a
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
C4N81813929
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

Phoenix M E Ltd’s tender network

Assembling the network…

Also open now

Similar open tenders

26-E-STAN06-FOC08-INTERFLEX- West Tofts Camp-INTERFLEX Remediation (Work Package 5 - Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue

26-E-STAN07-FOC08-INTERFLEX-Wretham Camp-INTERFLEX Remediation (Work Package 9 - B CAMP Roof Winterisation)

Ministry of Defence

Closes 21 Aug 2026Construction
Value not publishedValue