Lot C: River Colne Constructed Wetland Outline Design and Feasibility
Lot C: River Colne Constructed Wetland Outline Design and Feasibility
The procurement contact named on the official notice.
The submission route named on the official notice.
This sits below the typical range for Construction contracts — a smaller, more accessible award. Based on 64,002 valued Construction tenders in our corpus.
This tender will encompass the following activities.
1.
Topographical, hydrological, sediment and water quality surveys to understand the through-flow regime, likely input quality and quantities for a range of surface water run-off conditions.
2.
Strategic investigation of on-site ground contamination and suitability of existing sediments for re-use or to allow identification of requirements for disposal (including Water Regulations (WR), Waste Management (WM3), and Waste Acceptance Criteria (WAC) as needed).
3.
Biodiversity Net Gain assessment and Preliminary Ecological Appraisal highlighting lessons learned from the historic wetland design where evidence exists.
4.
A multi-criteria options appraisal matrix to record and assess relative costs and benefits of a variety of sub-options and approaches to determine an evidenced preferred option.
5.
Lead a stakeholder workshop and consultation exercise.
6.
Provide appropriate information design to support discussions with stakeholders including reference to options for sediment movement volumes, space for sediment drying / processing area, gravel quantities / sourcing, water volume and retention requirements for functional filtration and water quality improvements, options for widening boundary onto playing fields if needed, etc re design and permitting constraints.
7.
Develop the preferred option into a more formalised and feasible outline design that can be used in wider consultation and in early permitting discussions to enable an iterative design process and clearly specifies the required detail going forwards.
8.
Identify the requirements for gaining consents.
9.
Create / initialise necessary documentary evidence and applications for consents to build, using approved outline designs.
10.
Attend regular meetings with the project manager and external stakeholders (as agreed) to inform design process.
See detail in section 4.
11.
Include detail of the likely management and maintenance requirements post construction to ensure sustainability and longevity of the constructed wetland.
To include description, scale and optimal frequency of necessary ongoing maintenance activities where relevant.
For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Watford:-River-regulation-and-flood-control-works./BQW35F353G To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/BQW35F353G
What the supplier must deliver
Include detail of the likely management
Include detail of the likely management and maintenance requirements post construction to ensure sustainability and longevity of the constructed wetland.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Lot C: River Colne Constructed Wetland Outline Design and Feasibility, and generate a go-to-market strategy from their news, accounts and people.
The full intelligence dossier
Our agent reads Lot C: River Colne Constructed Wetland Outline Design and Feasibility’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ocds-h6vhtk-0589a1
- Stage
- tender · Open
- Source
- Find a Tender
- Buyer ref
- 049440-2025
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Lot C: River Colne Constructed Wetland Outline Design and Feasibility’s tender network
Assembling the network…
Similar open tenders
LB HIllingdon- Grange Park Wetlands- Flood Restoration Project
London Borough of Hillingdon
Design and Installation of Photovoltaic and Battery Storage Systems at Various Educational Establishments
Blaenau Gwent County Borough Council