Northern Ireland Housing Executive

Modern Methods Construction Feasibility Study for New Build Housing Pilot- Poleglass - Belfast Region

ConstructionCPV 44211000
ValueValue not published
Deadline
Published7 May 2025
RegionNationwide
Who to contact
cprocurement@nihe.gov.uk
cprocurement@nihe.gov.uk

The procurement contact named on the official notice.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The NIHE is undertaking a feasibility study for ‘New Build Housing.’ This study will investigate and compare different types of Construction including Modern Methods of Construction (MMC) and a traditional approach.

The MMC options include volumetric systems, panelised systems, ICF and site based versions however other versions of MMC not listed will be considered for inclusion.

1.2 The feasibility study will provide the Employer (NIHE) with design solutions that are robust and cost effective and that the NIHE could potentially adopt for the future re-development of demolished or disused housing stock.

1.3 Feasibility Study Objectives: • To compare the performance of different construction methods that will meet statutory requirements and the needs of the NIHE as a minimum by providing warm, dry, robust dwellings that are quick to erect and easy to maintain. • To provide comparable cost information on the prescribed types of MMC which can be directly compared to traditional masonry construction, to inform the NIHE in identifying the building approach that best meets its needs.

1.4 As part of the feasibility study, the NIHE is asking input from the industry to aid the comparison process between the differing methods and inform the end result for the provision of housing to a site at no.s 2-4 Good Shepherd Road, Belfast.

The proposal will comprise of 3no.

2 bedroom, 3 person, terraced units and 1 no.

2 bed, 3 person detached fully accessible single storey unit.

The site specific information, layouts and performance specification will be provided by the NIHE.

1.5 The Consultant is responsible to the Employer for the provision of detailed information, as described in this brief, regarding their specialist building method and the performance thereof.

Feasibility Study Outputs 1.6 The employer will provide a performance specification for the provided site plan, floor plans, elevations and sections upon appointment.

To fulfil the objectives of the feasibility study, the Consultant will be required to provide:- • Detailed description of the type of MMC being proposed and its specific benefits for comparative purposes. • Design of the structure, materials and finishes, based on the layouts to be provided • Detailed information to be provided regarding the extent of the works to be completed on site to enable delivery of the offsite product. • Proposed u-value calculations for walls, floors and roofs, for the unit design provided. • Proposed programme in the form of a Gantt chart or similar, for the building as a whole, from design stage, through to manufacture (if applicable), to construction on site and completion. • Life cycle costs estimate. • Estimated cost of construction, excluding the cost of groundworks, foundations, statutory fees and professional design fees with the budget cost estimate also for the scheme proposed to attain Passivhaus (PH) standard. • Carbon performance information and figures for embodied, operational and circular.

Quality, Technical Standards and Compliance 1.7 The dwelling designs should meet the following standards: • Partially or fully prefabricated off-site and delivered to the client specification as a minimum. • Construction detailing to meet the standards of the current N.I.

Building Regulations as a minimum, unless otherwise stated. • Target SAP to meet Part F1 as a minimum for standard unit and option to meet Passivhaus standard if available for PH option. • DER (dwelling emission rate) to meet or exceed TER (target emission rate) in accordance with the Building Regulations of NI.* • To attain airtightness target of max 5 m3/(h.m2) at a pressure difference of 50 Pascals and for the PH option, Air permeability target of 0.6 ACH 50 pa in accordance with PH criteria. • Provision of intermittent ventilation or whole house mechanical ventilation system suitable for the proposed air permeability target. • NIHE provided performance specification. • An estimated off-site production of less than 6 months if applicable. • Low maintenance solution so as to maintain the fabric of the building and the fixtures in a cost effective manner. • Warranties: Details to be provided regarding warranties / accreditations, held by the proposed system. • Full compliance with all relevant, current, environmental legislation.

Cost Summary to be provided in accordance with SMM7 and set out within the template to be provided.

Any assumptions are to be listed and breakdown of miscellaneous or sundry items to be provided.

Key requirements

What the supplier must deliver

01

1.2 The feasibility study will provide

1.2 The feasibility study will provide the Employer (NIHE) with design solutions that are robust and cost effective and that the NIHE could potentially adopt for the future re-development of demolished or disused housing stock.

02

To compare the performance of different construction

To compare the performance of different construction methods that will meet statutory requirements and the needs of the NIHE as a minimum by providing warm, dry, robust dwellings that are quick to erect and easy to maintain.

03

To provide comparable cost information on

To provide comparable cost information on the prescribed types of MMC which can be directly compared to traditional masonry construction, to inform the NIHE in identifying the building approach that best meets its needs.

04

1.6 The employer will provide a performance

1.6 The employer will provide a performance specification for the provided site plan, floor plans, elevations and sections upon appointment.

05

To fulfil the objectives of the feasibility

To fulfil the objectives of the feasibility study, the Consultant will be required to provide:-.

Derived from the notice text — always confirm against the original documents.

The gates

What this notice demands of you

1 named in obligation language, 0 mentioned. Each one is quoted from the notice.

Passivhaussays mustCertification & assessment schemes
Target SAP to meet Part F1 as a minimum for standard unit and option to meet Passivhaus standard if available for PH option.

Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.

Buyer intelligence

Make the case to bid

Reveal who to approach at Northern Ireland Housing Executive, and generate a go-to-market strategy from their news, accounts and people.

Deep dive · beta

The full intelligence dossier

Our agent reads Northern Ireland Housing Executive’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.

Source & provenance
OCID
ocds-h6vhtk-050d86
Stage
planning · Planning
Source
Find a Tender
Buyer ref
019256-2025
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction Materials & Structures

Scroll to explore the market network

Northern Ireland Housing Executive’s tender network

Assembling the network…

Also open now

Similar open tenders

Modular Offsite Construction (Supply of New Build Dwellings)

Procurement Assist Limited c/o Integrated Facilities Management Bolton Ltd (iFM Bolton)

Closes 31 May 2029Construction Materials
£100.0mValue

New Build Contractors (Offsite Construction, Delivery & Install)

Procurement Assist Limited c/o Integrated Facilities Management Bolton Ltd (iFM Bolton)

Closes 31 May 2029Construction Materials
£100.0mValue