RFP QuestBeta
Awarded · ResultStage · contract

NMRN Operations

National Museum of the Royal Navy Hartlepool - Kitchen Improvements

ConstructionCPV 45000000 45400000 45450000 45453000 44000000 44200000 44210000 44212000 45200000 45210000 45212000
ValueValue not published
Awarded7 Dec 2020
Published16 Nov 2020
RegionNorth East
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

The brief

3.1 Background Following recommendations from environmental health, NMRN Hartlepool is seeking quotes for improvements to the surface areas in the main kitchen.

Currently, the kitchen walls and floors are tiled and there is a tiled suspended ceiling.

It is proposed to upgrade the wall surfaces to HACCP approved cladding and to replace the floor tiles with a sealed, anti-slip surface suitable for a commercial kitchen environment.

The ceiling should also be replaced with an appropriate material.

There are numerous exposed pipes in various materials, making the kitchen difficult to clean.

This should also be addressed where possible.

Improvements should extend to the dry food store and walk-in fridge.

All submissions should meet the required safety standards of commercial kitchen environments.

3.2 Requirements 3.2.1 Walls Stainless steel or PVC cladding (or similar), sealed at edges Firesafe material impervious to moisture, grease and food particles Washable 3.2.2 Ceiling Tight wall to ceiling joint constructed in such a way as to prevent moisture or grease collecting in the corners Firesafe material impervious to moisture, grease and food particles Washable Access maintained for maintenance 3.2.3 Flooring Non-slip surface impervious to moisture, grease and food particles Coving where the flooring meets the wall to prevent build-up of dirt in corners 3.2.4 Plumbing and electrical work Proposals should include provision for improving exposed pipework for ease of cleaning e.g. by concealing pipework (but maintaining access for maintenance where required) Sockets should be surface mounted on the new wall surface and replaced where damaged.

3.2.5 Other Existing metal shelving and pest traps etc. should be removed and reinstated on top of the new cladding.

Key requirements

What the supplier must deliver

01

The ceiling should also be replaced

The ceiling should also be replaced with an appropriate material.

02

This should also be addressed where possible

This should also be addressed where possible.

03

Improvements should extend to the dry food

Improvements should extend to the dry food store and walk-in fridge.

04

All submissions should meet the required safety

All submissions should meet the required safety standards of commercial kitchen environments.

05

Proposals should include provision for improving exposed

Proposals should include provision for improving exposed pipework for ease of cleaning e.g. by concealing pipework (but maintaining access for maintenance where required).

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at NMRN Operations, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
cae05ac7-7cf0-4f72-8306-259911759791
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
MT221147
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

NMRN Operations’s tender network

Assembling the network…

Also open now

Similar open tenders

Land Warfare Hall Demolition Works at Imperial War Museums (IWM) Duxford

Imperial War Museums

Closes 11 Sept 2026Construction
£1.0mValue

ESPLANADE GARDENS, ROCHESTER LANDSCAPE IMPROVEMENTS

Medway Council

Closes 27 Aug 2026Construction
£450kValue