National Museums Liverpool

National Museums Liverpool Canning Graving Docks Quayside Enabling Works

ConstructionCPV 45000000
Value£28k
Awarded17 Aug 2020
Published6 Oct 2020
RegionNorth West
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£28ktotal contract value
median £158k
this tender£0£6.5m

This sits below the typical range for Construction contracts — a smaller, more accessible award. Based on 64,002 valued Construction tenders in our corpus.

The brief

This project of minor enabling works is located at the Canning Graving Docks.

It is currently an unrealised focal point within the heart of Liverpool's maritime World Heritage Site.

Over the course of the next ten years, our vision is to develop this spectacular eighteenth-century dockland to create a modern visitor destination.

The Canning Graving Dock quaysides are currently inaccessible, with waste building materials stored across the site and fencing restricting public access.

This project is aimed at clearing the largest quay of materials and debris, replacement of heras and low level crowd barriers surrounding the quayside perimeter, the design and installation of temporary lighting, repair of loose or missing setts, and preparing the site for any future works.

The site must be cleared and safe to use by the public by the October 2020.

These works are the first phase of minor enabling works, and whilst the lighting and fencing are temporary interventions, they must be robust enough to withstand wind loading and vandalism, and operate for the duration of time until the next phase of works may be undertaken.

In light of the Covid-19 pandemic, clearing the site and opening up to the public once more is all the more pressing.

Having the site open for visitors to enjoy will also provide opportunities to hold events and commercial activities, which will assist NML in the recovery period.

NML seeks a contractor to undertake the enabling works at the Canning Graving Dock quayside.

The works will involve the following areas: site preparation, fencing, lighting and interpretation display stands.

The site preparation will include the removal of building materials from site, clearing all loose debris and repairing any loose or missing granite setts.

Surplus sets are located onsite and available to use for remedial works.

Access to the site is currently restricted by low level crowd barriers and heras fencing, which have been in situ for some time.

Several fencing sections have become damaged and additional sections are required.

The contractor will be required to remove parts of the existing fencing/ barrier sections and replacing with low level pedestrian barrier throughout the perimeter of the largest quay.

The barrier must be braced and anchored to the ground to prevent any movement from wind loading or interference by people.

The barrier must provide adequate restraint from the steep drop into the Graving Dock basin one the one side, and the Canning Half Tide Dock to the other side.

There is also a railing situated between the Lusitania propeller and the Carters Horse monument which must be removed, and the ground made good.

These works are aimed at enabling public access and any future developments to the site which we may undertake.

Works must be complete by the end of summer to enable public access by the October half term 2020.

Key requirements

What the supplier must deliver

01

The site must be cleared and safe

The site must be cleared and safe to use by the public by the October 2020.

02

These works are the first phase

These works are the first phase of minor enabling works, and whilst the lighting and fencing are temporary interventions, they must be robust enough to withstand wind loading and vandalism, and operate for the duration of time until the next phase of works may be undertaken.

03

Having the site open for visitors

Having the site open for visitors to enjoy will also provide opportunities to hold events and commercial activities, which will assist NML in the recovery period.

04

The contractor will be required to remove

The contractor will be required to remove parts of the existing fencing/ barrier sections and replacing with low level pedestrian barrier throughout the perimeter of the largest quay.

05

The barrier must be braced and anchored

The barrier must be braced and anchored to the ground to prevent any movement from wind loading or interference by people.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at National Museums Liverpool, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
984ca0ef-279b-4dcd-9bd8-aa67cce68eae
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
National Museums Liverpool Canning Graving Docks Quayside Enabling Works
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

National Museums Liverpool’s tender network

Assembling the network…

Also open now

Similar open tenders

Land Warfare Hall Demolition Works at Imperial War Museums (IWM) Duxford

Imperial War Museums

Closes 11 Sept 2026Construction
£1.0mValue

PENLEE HOUSE GALLERY & MUSEUM ROOF REPAIR WORKS

Penzance Town Council

Closes 11 Aug 2026Construction
£105kValue