RFP QuestBeta
OpenStage · tender 37 days to close

COURTAULD INSTITUTE OF ART

Demolition & Structural Alterations

ConstructionCPV 45262700
Value£6.0m
Deadline27 Aug 2026
Published14 Jul 2026
RegionNationwide
Timeline
Published 14 Jul 202637 days leftCloses 27 Aug 2026
Who to contact
anthony.tyrrell@courtauld.ac.uk

The procurement contact named on the official notice.

How to submit
Open the submissions portal

https://www.example.com/ Must be submitted electronically to John.Burgess@aecom.com, o.stebbing@gardiner.com, rebecca.lim@courtauld.ac.uk and anthony.tyrrell@courtauld.ac.uk

The submission route named on the official notice.

Contract value in context
£6.0mtotal contract value
median £158k
this tender£0£6.5m

This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

All structural interventions, modifications and demolition as detailed in Price & Myers, Witherford Watson Mann and Purcell design drawings; Demolition of Strand floor, facade, and other elements as specified by the design engineers; Survey and investigation works required to ensure design and methodology is completed in time within the restraints of the existing structure; Localised noise, dust and vibration monitoring; Clean and re-use of existing brickwork for new wall installs; Formation of new floors including padstones or steel bearing plates, steels, joisting and sheathing; Formation and infills to all pockets formed for new structure install, both for this package and other (i.e.

Structural Steelwork), including padstones and steel bearing plates; All mass poured, pre-cast, or reinforced concrete works including the new stair core, stairs, underpinning, pads, ramps, slabs and upstands; All dry packing, grouting, and encasement to steel members, including those installed by Others; Attendance and return visits required for the above installs by Others; External Luxcrete repairs; CCTV and repairs of existing below ground drainage.

CCTV of new drainage; Install of items free issued by others (e.g. cast-in plates by Structural Steelwork contractor); Where shown in package split, all new primary and secondary steelwork, connections, metal deck, intumescent coating, padstones, steel bearing plates and dry packing; Alterations to existing structure including formation of new risers and services penetrations, box frames and trimmer steels and timbers; 3rd party review and confirmation of any intumescent and fire stopping installs; Forming of all new lift pits including underpinning, reinforcement and waterproof concrete; Installation of all waterproofing, blinding, insulation and sump (including commissioning) requirements; Facade and party wall retention propping to facilitate demolition Works; Demolition of existing stairwell in the East Wing including all associated temporary works, and infill of new landing; All blockwork and brick walls as shown in package split including windposts; Form new openings including lintels, beams, posts; Re-levelling of existing floor substrates; Removal and excavation of existing screed and slabs, including localised repaires where required; Covering or edge protection install to all voids and openings formed by the Works; Installation of riser flooring systems to all newly formed and existing riser opening; Strengthening of existing beams, including services opening coordination and formation; Removal or containment of any asbestos (e.g.

Strand buildings timber flooring), lead, guano and anthrax where required to complete the Works, with appropriate measures in place; Removal, protection and off-site storage of heritage items such as stone beams and flags, grilles, fireplaces and hearths; Removal of existing heritage windows following surveys by Others; Installation of tower crane base including piles and cap; Fire and corrosion protection to steel in-situ application (new only); Temporary & permanent steel bracing; Protection of all existing heritage finishes (where at risk of damage from the works); All scaffolding and crash decks to facilitate the works (e.g.

Strand south facade elevation); Propping of existing vaults at Strand; Underslab drainage works and GRP sumps; Surveys of existing structure, looking ahead on programme to avoid last minute discoverables; Install of gulleys, manhole covers and associated below-ground drainage components;

Key requirements

What the supplier must deliver

01

Survey and investigation works required to ensure

Survey and investigation works required to ensure design and methodology is completed in time.

02

Anthrax where required to complete the Works

anthrax where required to complete the Works, with appropriate measures in place;.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at COURTAULD INSTITUTE OF ART, and generate a go-to-market strategy from their news, accounts and people.

Deep dive · beta

The full intelligence dossier

Our agent reads COURTAULD INSTITUTE OF ART’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.

Source & provenance
OCID
ocds-h6vhtk-06cb61
Stage
tender · Open
Source
Find a Tender
Buyer ref
066471-2026
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction

Scroll to explore the market network

COURTAULD INSTITUTE OF ART’s tender network

Assembling the network…

Also open now

Similar open tenders

BCU-ITT-62955 - Structural Strengthening works to Pathology Laboratory RAAC Roof - Wrexham Maelor Hospital

Betsi Cadwaladr University Health Board

Closes 18 Aug 2026Construction
£400kValue

2026 - 1081 Remedial Insurance Repairs from Fire, Flood, Structural, Disrepairs and Other Associated Works

Citizen Housing Group Ltd

Closes 14 Aug 2026Construction
Value not publishedValue