Plot 3, Infrastructure Works, Temple Quay
The Plot 3 Infrastructure works around Temple Quay being approximately 3,000m2 of pavement construction, generally comprise of stone capping with tarmac sub-base, sand and block paving, and "Earthworks associated works will include the following components: o Earthworks Extension of Friary to Meads Reach Bridge o This work would comprise the extension of Friary as a two carriageway road east of Isambard Walk to Meads Reach Bridge.
Access to the extended Friary would be controlled for service vehicles only through the provision of bollards. o As part of this work the footway to the north of Friary (adjacent to the Plot 3 development site) would be extended to 6 metres in width, as will the footway to the south (adjacent to the station) would be made 8.5 metres in width and include the provision of 6 new benches and an avenue of 5 new trees. o A visitor drop off area is also proposed adjacent to the potential Conference Centre entrance at Plot 3 Flexible Public Space o Space for temporary use will also be provided between the extended Friary and the Grade 1 listed retaining wall off the Goods Shed, any proposals for temporary use of this area would be subject to a separate application o The area will be finished with seating terraces, and a planted bank to tie into the existing levels. o This area will also need to be made capable of accommodating the occasional vehicle turning.
Opening Isambard Walk as a two-way vehicular street between Friary and Temple Back East o The existing pedestrianised Isambard Walk will be opened for two-way vehicle access to create a link between Temple Back East and Friary, and to tie in with the existing road of the private estate, a new footway will also be provided to the eastern side of the Isambard Walk new carriageway. o Isambard Walk will act as a shared space, and be treated to reduce the potential dominance of vehicles and reduce vehicle speeds o The footway, trees, cycle parking and street furniture to the west of Isambard Walk and in The Square would remain as existing.
Temple Back East o The existing turning head area on Temple Back East would be removed, to allow two way vehicular access to Isambard Walk o Two way vehicular access will be maintained to Rope Walk, with a left turn out of Rope Walk into Isambard Walk to be provided for o Existing crossing will be maintained across from The Square to the footway on Temple Back East
What the supplier must deliver
O This area will also need
o This area will also need to be made capable of accommodating the occasional vehicle turning.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at HOMES & COMMUNITIES AGENCY, and generate a go-to-market strategy from their news, accounts and people.
The full intelligence dossier
Our agent reads HOMES & COMMUNITIES AGENCY’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 8edc5645-4964-40bd-b0a7-96d5bcd799b4
- Stage
- preprocurement · Withdrawn
- Source
- Contracts Finder
- Buyer ref
- HCAP16063
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
HOMES & COMMUNITIES AGENCY’s tender network
Assembling the network…