PR3930-WH-Boiler Replacement at Goodinge Health Centre.
This is a contract result notice, not an open opportunity. Details from the official award data.
This sits below the typical range for Industrial Machinery contracts — a smaller, more accessible award. Based on 5,734 valued Industrial Machinery tenders in our corpus.
The contractor shall allow to install the new boiler, associated equipment and controls prior to the replacement of the existing boilers expansion vessel and safety valve.
This is to ensure that the heating and hot water to the day care centre and health clinic are not affected by the works in any way with the exception of the flue works which must be undertaken in close liaison with the building operators.
The contractor shall allow for all necessary temporary power etc. to enable the above clause to be realised.
A new control points will be installed concurrently.
All plant items tested and commissioned by the manufacturers etc.
The Tender will be computed in strict accordance with the Specification, however, where the Contractor wishes to put forward alternative equipment or method to that specified, notice in writing must be given at the time the Tender is submitted stating: • The alternative equipment or method proposed, and • The cost implications of the alternative submitted Should the alternatives although agreed by the Engineers prove of lower quality when installed than that specified, the Contractor shall revert to the original material or intent at their own cost.
What the supplier must deliver
The contractor shall allow to install
The contractor shall allow to install the new boiler, associated equipment and controls prior to the replacement of the existing boilers expansion vessel and safety valve.
This is to ensure that the heating
This is to ensure that the heating and hot water to the day care centre and health clinic are not affected by the works in any way with the exception of the flue works which must be undertaken in close liaison with the building operators.
The contractor shall allow for all necessary
The contractor shall allow for all necessary temporary power etc. to enable the above clause to be realised.
The Tender will be computed in strict
The Tender will be computed in strict accordance with the Specification, however, where the Contractor wishes to put forward alternative equipment or method to that specified, notice in writing must be given at the time the Tender is submitted stating:.
Should the alternatives although agreed by
Should the alternatives although agreed by the Engineers prove of lower quality when installed than that specified, the Contractor shall revert to the original material or intent at their own cost.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Partners Procurement Service, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 2d3fb1df-a9f6-47d9-a81b-881f0a0ad62d
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- LPPUCLPPS01-DN294853-43545428
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Industrial Machinery
Partners Procurement Service’s tender network
Assembling the network…