Awarded · ResultStage · contract

North Northamptonshire Council

Request for Quotation Pond Dipping Platform at Sywell

Construction MaterialsCPV 44100000 44200000 44400000 45000000 71300000
Value£74k
Awarded21 Jan 2026
Published6 Feb 2026
RegionNationwide
Outcome — awarded

This is a contract result notice, not an open opportunity. Details from the official award data.

Contract value in context
£74ktotal contract value
median £135k
this tender£0£4.1m

This sits in the lower-middle of the Construction Materials & Structures band — a mid-scale opportunity. Based on 10,341 valued Construction Materials & Structures tenders in our corpus.

The brief

Should you wish to take part in the selection process please complete this RFQ and return via e-mail rebecca.jenkins@northnorthants.gov.uk Sywell Country Park is undertaking the installation of a new industrial-grade pond dipping platform to enhance visitor engagement and educational activities around the amphibian pond area.

The platform will provide a safe, durable, and accessible structure for public use, including school groups and families, while meeting all relevant structural and environmental standards.

The proposed design, as detailed in the engineering drawings, specifies a robust steel framework constructed from Grade S355 structural steel in accordance with BS 5950:2000 and the National Structural Steelwork Specification.

All steelwork will be fabricated to BS EN 1090-1:2009 + A1:2011 Execution Class EXC2, ensuring compliance with current UK and EU standards for structural integrity.

Key structural elements include: Beams: Parallel flange channels (PFC) sized 200x90x29.7 mm (Refs B1, B2, B3).

Columns: Square hollow sections (SHS) 100x100x6.3 mm for up to 1.75 m height and 120x120x10 mm for up to 2.5 m height (Refs C1, C2, C3).

Connections: Fully welded 10-12 mm thick plates with continuous fillet welds and bolted using M16 Grade 8.8 bolts, hot-dip galvanised to BS 729.

Foundation: Columns fixed to existing concrete base via 350x350x12 mm base plates anchored with resin bolts (minimum 125 mm embedment), finished with non-shrink grout.

To ensure longevity and environmental safety, all steel components will be: Shot blasted to SA 2.5 or mechanically wire-brushed to remove contaminants.

Hot-dip galvanised prior to delivery.

Coated with a non-toxic, fish-safe epoxy finish suitable for prolonged underwater exposure, applied per manufacturer's instructions.

The platform will incorporate open grid grating panels for drainage and slip resistance, with optional Glass Reinforced Plastic (GRP) decking if required.

Handrails will be installed using Kee Klamp galvanised fittings, complying with manufacturer specifications for safety and durability.

This installation will replace an existing opening in the stone wall, which will be infilled on a like-for-like basis to maintain the heritage character of the site.

All works will be carried out by competent contractors following approved method statements and CDM 2015 guidelines.

Key requirements

What the supplier must deliver

01

Should you wish to take part in

Should you wish to take part in the selection process please complete this RFQ and return via e-mail rebecca.jenkins@northnorthants.gov.uk.

02

The platform will provide a safe, durable

The platform will provide a safe, durable, and accessible structure for public use, including school groups and families, while meeting all relevant structural and environmental standards.

03

To ensure longevity and environmental safety, all

To ensure longevity and environmental safety, all steel components will be:.

04

This installation will replace an existing opening

This installation will replace an existing opening in the stone wall, which will be infilled on a like-for-like basis to maintain the heritage character of the site.

Derived from the notice text — always confirm against the original documents.

The gates

What this notice demands of you

2 named, none in explicit obligation language. Each one is quoted from the notice.

All works will be carried out by competent contractors following approved method statements and CDM 2015 guidelines.
All steelwork will be fabricated to BS EN 1090-1:2009 + A1:2011 Execution Class EXC2, ensuring compliance with current UK and EU standards for structural integrity.

Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.

Buyer intelligence

Make the case to bid

Reveal who to approach at North Northamptonshire Council, and generate a go-to-market strategy from their news, accounts and people.

Source & provenance
OCID
1acee44e-71ca-469c-bd71-89d3fb2e216e
Stage
contract · Contract
Source
Contracts Finder
Buyer ref
Pond Dipping Platform at Sywell
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Construction Materials & Structures

Scroll to explore the market network

North Northamptonshire Council’s tender network

Assembling the network…