RFP QuestBeta
ClosedStage · preprocurement

UK Battery Industrialisation Centre

Slitter Equipment for UKBIC Flexible Industrialisation Line (FIL)

Industrial MachineryCPV 42000000
ValueValue not published
Deadline8 Dec 2022
Published8 Sept 2022
RegionLondon
Timeline
Published 8 Sept 2022ClosedCloses 8 Dec 2022
Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

UKBIC have a requirement for the provision of a flexible Slitting system to fit into a clean and dryroom.

This system would need to be representative and scale-able to a larger system • Slitting machine needs to be capable of slitting all common li-ion electrode thicknesses. • Machines in the range of 320mm to 640mm foil width will be considered.

Minimum slit width down to 50mm. • Trim edges down to 10mm, with collection of trim for disposal.

Maximum of 8 slit widths. • The slitting width accuracy must be better than +/- 0.2 mm. • The slitter must collect the dust parts from slitting the coated foil. • The slitter will be operated in a clean and dry environment.

Equipment to be capable of operating in a -70°C dewpoint environment. • Please provide previous experience history of slitting li-ion or other electrodes.

One Slitting machine must be procured - if budget allows, a second Slitting machine may be procured to separate anode and cathode Slitting process to avoid cross-contamination.

The tenderer is encouraged to provide a quotation to suggest what savings could be made if a second slitter was ordered at the same time as the first.

The equipment must offer modular solution, so equipment can be easily reconfigured or decommissioned in the future.

Bidders are encouraged to offer alternate slitting systems applicable to battery electrodes e.g laser slitting.

All equipment to provide UKCA conformity.

Key requirements

What the supplier must deliver

01

This system would need to be representative

This system would need to be representative and scale-able to a larger system.

02

Slitting machine needs to be capable

Slitting machine needs to be capable of slitting all common li-ion electrode thicknesses.

03

The slitting width accuracy must be better

The slitting width accuracy must be better than +/- 0.2 mm.

04

The slitter must collect the dust parts

The slitter must collect the dust parts from slitting the coated foil.

05

Equipment to be capable of operating in

Equipment to be capable of operating in a -70°C dewpoint environment.

Derived from the notice text — always confirm against the original documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at UK Battery Industrialisation Centre, and generate a go-to-market strategy from their news, accounts and people.

Deep dive · beta

The full intelligence dossier

Our agent reads UK Battery Industrialisation Centre’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.

Source & provenance
OCID
75a27d90-21ed-41b8-8cc6-da051c5df4ab
Stage
preprocurement · Closed
Source
Contracts Finder
Buyer ref
UBIC001-DN631365-87727118
View the original notice on Contracts Finder

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Industrial Machinery

Scroll to explore the market network

UK Battery Industrialisation Centre’s tender network

Assembling the network…

Also open now

Similar open tenders

The Supply, Delivery and Installation of Water Municipal Screens, Spares and Associated Equipment

United Utilities Water Limited

Closes 2 Oct 2026Construction
£67.2mValue