RAIL SAFETY AND STANDARDS BOARD LIMITED
T1244 Characterising the Pantograph and Overhead Contact System
RAIL SAFETY AND STANDARDS BOARD LIMITED publishes Research & Development work continuously — 69 notices, roughly one every 18 days. This is a stream to watch, not a cycle to wait for.
Background As new electric rolling stock is introduced or existing rolling stock is assigned to different routes, compatibility assessments between the vehicle and infrastructure are undertaken to ensure safe working at the pantograph-catenary interface.
Analysis is usually undertaken on a case by case basis utilising expert analysis, data and validated software models.
This process can add cost and potentially a significant time delay on the critical path to introducing new rolling stock.
Over the coming years, a large number of new rolling stock is planned to be introduced across the network, and with potentially increasing variability across designs (e.g. multiple pantographs and higher speeds), there will likely be a requirement for a lot more compatibility assessments.
Through the cross industry Vehicle - Traction Energy System Interface Committee (V/TE SIC), the rail industry has proposed research be undertaken to define reference cases of varying combinations of pantograph and overhead contact system interaction, to generalise compatibility assessment, with the aim to ultimately reduce costs and time taken in approving vehicles for new routes.
This research project intends to test the suitability of a such a generalised approach and to populate a Compatibility Matrix of reference cases that can be used to expediate future assessments.
Objectives This research is targeted at improving the industry's understanding of existing compatibility between legacy Overhead Contact Systems (OCS) and electric vehicles, and to provide an evidence base to potentially modify the challenging requirements in standards, specifically • GMRT 2111 Rolling Stock Subsystem and Interface to AC Energy Subsystem • GLRT 1210 AC Energy Subsystem and Interfaces to Rolling Stock Subsystem Currently standards specify current collection criteria at the interface as opposed to being specified at the OCS or vehicle level meaning that many Full Compatibility Assessments are required as vehicles are cascaded across the network, often done on a case by case basis requiring testing and simulation on validated models with little applicability to other rolling stock.
The ambition of this project is to make introduction of new rolling stock quicker and cheaper by: 1.
Providing a clear set of criteria for the specifier, including key parameters such as pantograph spacing and maximum speeds 2.
Demonstrating some of the existing proven capabilities for existing rolling stock/pantograph and OCS combinations Ultimately this will benefit the industry through 1.
Reduced cost in compatibility assessment cost.
2.
Reduce risk to timescales for new vehicle introduction, making the industry more dynamic and flexible in usage of rolling stock.
What the notice asks for
As new electric rolling stock is introduced
As new electric rolling stock is introduced or existing rolling stock is assigned to different routes, compatibility assessments between the vehicle and infrastructure are undertaken to ensure safe working at the pantograph-catenary interface.
This research is targeted at improving
This research is targeted at improving the industry's understanding of existing compatibility between legacy Overhead Contact Systems (OCS) and electric vehicles, and to provide an evidence base to potentially modify the challenging requirements in standards, specifically.
Demonstrating some of the existing proven capabilities
Demonstrating some of the existing proven capabilities for existing rolling stock/pantograph and OCS combinations.
Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.
Make the case to bid
Reveal who to approach at RAIL SAFETY AND STANDARDS BOARD LIMITED, and generate a go-to-market strategy from their news, accounts and people.
Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.
The full intelligence dossier
Our agent reads RAIL SAFETY AND STANDARDS BOARD LIMITED’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Five included while we’re in beta, and the agent asks before it spends on any paid step.
- OCID
- 8e4e9896-f8c5-442a-89f9-445e4a749be6
- Stage
- preprocurement · Closed
- Source
- Contracts Finder
- Buyer ref
- T1244 Characterising the Pantograph and Overhead Contact System
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Research & Development
RAIL SAFETY AND STANDARDS BOARD LIMITED’s tender network
Similar open tenders
PS25001 - Scientific Research and Advice for Government Dynamic Purchasing System - Ongoing DPS Application
The Department for Science, Innovation & Technology (DSIT)
Dynamic Purchasing System for the Provision of Insights for Behaviour Insights, Engagement and Research
Sunderland City Council