BS 5839 (fire detection & alarm systems)
Standards the work must meet · awarded by BSI · serves: Fire alarm engineers
- Notices demanding it
- 79
- a floor
- Said “must”
- 17
- explicit obligation
- Open right now
- 0
- Value gated
- £17m
- a floor
Published values on the notices that demand it — a floor, not a total.
The demand curve
Notices demanding it per 10,000 published, by year — rate-normalised so corpus growth never masquerades as demand. Complete years only.
The pale bars are 2025 onward. The Procurement Act went live on 24 February 2025 and changed how notices are written, so the step across that date is partly a change in convention and not only a change in demand. We have not measured how much of it is which, so please do not read this as a trend.
The receipts
Notices that demand it, and the sentence each demand was found in. Nothing is counted here without one.
- BCU-ITT-61954 YG DATACENTRE PROJECT mandatory
Betsi Cadwaladr University Health Board
All works must comply with relevant standards, including CDM 2015, Building Regulations, BS 7671, BS EN 50600 (Data Centre Infrastructure), BS 5839 1, BS EN 15004, and NHS Wales digital and estates requirements.
City of Bradford Metropolitan District Council
All installation work and compliance testing on must be carried out in accordance with BS 7671: 2018 requirements for electrical installations, BS 5839-1:2025 Fire Detection and Fire Alarm Systems in Buildings and subsequent amendments, BS 4737-4.3: 1988 Intruder Alarm Systems in Buildings and subsequent amendments, BS…
- Fire Alarm Maintenance 2023mandatory
UNIVERSITY OF SALFORD(THE)
Services shall be provided in accordance with the minimum standards defined in British Standard BS 5839-1:2017, with particular reference to section 6 "Maintenance" together with any enhanced standards as defined in this document.
- OLDBURY FIRE SYSTEMS MAINTENANCEmandatory
Magnox Ltd
Fire detection maintenance at Oldbury Site is required to ensure compliance with The Regulatory Reform (Fire Safety) Order 2005 and BS5839 Section 6 (fire detection & alarm systems for buildings).
Guy's and St Thomas' NHS Foundation Trust
This Objective shall ensure the equipment is maintained and tested based according to the requirements of BS5839-1:2017.
Sellafield
The Fire Detection System is Siemens Sinteso fully addressable, networked system which must be maintained and tested in accordance with the British Standard BS5839.
Curo Group
Lot 2 of the Curo Fire Safety Framework shall comprise of the delivery of domestic smoke detection installations, in line with BS 5839-6 and Curo's Technical Specifications.
Pennine Acute Hospitals NHS Trust
The Contractor shall carry out the Periodic Servicing of each Fire Alarm and Gaseous Fire Suppression System shall in accordance with the appropriate British Standard including BS5839-1:2017, BS6266:2011, and HealthTechnical Memorandum (HTM) 05-03 Fire Safety Measures for Health Sector Buildings.
Calderdale Council
The Contractor shall only use skilled and fully qualified staff for the works, where working on live circuits they must be registered as NICEIC full members and meet the requirements of BS 5839.
- Delce Infants School - Fire Alarmmandatory
Medway Council
…ollowing scope of works/services The Scope of service for this project shall include but not be limited to: The requirements to provide full fire detection to BS 5839:1 2013 Category L2 throughout the school.…
Shepway District Council
The installation shall be compliant with BS 5839 Part 1: 2013 Category L1 and Part M of the Building Regulations.
MID ESSEX HOSPITAL SERVICES N H S TRUST
Surveys/inspections shall be carried out to ensure that emergency lighting installations comply with the Regulatory Reform (Fire Safety) Order 2005, Fire Alarm Standard BS 5839-1:2002 and also to meet Disability Discrimination Act (DDA) requirements specified in BS 8300.
See it live
No open tenders demand it at this moment — the list updates continuously.
Browse the tenders →Tell us what you already hold and we will show you which of these notices you were already eligible for — and what one more certificate would open.
Get set up free →Method: Every count here is a floor. We match the text of the notice, and a notice description is a summary — most tender packs demand things it never mentions.“Said must” counts only explicit obligation language in the matched sentence itself; anything ambiguous is counted as a mention, never as mandatory. Trend compares rates per 10,000 notices per complete calendar year.