The Council wishes to procure the following work:\r The Principal Bridge Inspection (PBI) undertaken in 2021 highlighted some high priority defects at Threapland Bridge that need remediation.\r \r It should be noted that where open mortar joints or joints containing friable or cracked mortar are found in the existing main arch, abutments, spandrel walls, wing walls and parapets, the joints shall be raked out down to sound mortar and repointed with mortar designation (ii) as described in the Specification for Highway Works.\r \r The following repairs are required to the brickwork and masonry:\r \r 1.
The spandrel walls require repointing throughout.\r 2.
Areas of spalled or missing brickwork on the spandrel walls require repair or replacement.\r 3.
The abutment walls require repointing throughout.\r 4.
The outer face of the abutment walls require repointing and possible stitching to remediate the existing cracking and separation.\r 5.
Areas of spalled, missing or loose brickwork on the abutment walls require repair or replacement.\r 6.
The gap between the rear abutment and adjacent bedrock on the upstream north and south face and the downstream north and south face should be pointed and sealed.\r 7.
The arch barrel requires repointing throughout.\r 8.
The arch rings at each elevation require repointing and possible stitching to remediate the existing separation.\r 9.
Missing brickwork on the arch ring should be replaced.\r 10.
The upstream and downstream brickwork headwalls require repointing.\r 11.
Missing brickwork from the headwalls require repair or replacement.\r 12.
The outer face of the upstream and downstream stone parapets require repointing.\r 13.
Missing stone from the outer face of the downstream parapet require repair or replacement.\r 14.
Vegetation (ivy, saplings etc) from the parapet outer faces should be removed.\r 15.
Mature trees (4No.) at each of the approaches should be removed and Eco Plugged.\r 16.
After the trees have been removed and where required the parapets should be extended to offer edge protection on approaching the bridge.
What the supplier must deliver
The following repairs are required to
The following repairs are required to the brickwork and masonry:\r.
The gap between the rear abutment
The gap between the rear abutment and adjacent bedrock on the upstream north and south face and the downstream north and south face should be pointed and sealed.\r.
Missing brickwork on the arch ring should
Missing brickwork on the arch ring should be replaced.\r.
Vegetation (ivy, saplings etc) from the parapet
Vegetation (ivy, saplings etc) from the parapet outer faces should be removed.\r.
Mature trees (4No.) at each of
Mature trees (4No.) at each of the approaches should be removed and Eco Plugged.\r.
Derived from the notice text — always confirm against the original documents.
Make the case to bid
Reveal who to approach at Cumberland Council, and generate a go-to-market strategy from their news, accounts and people.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- 7e4f9580-dac2-4d5a-9f60-e45c25303d72
- Stage
- contract · Contract
- Source
- Contracts Finder
- Buyer ref
- CC001-DN682041-53520027
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
Cumberland Council’s tender network
Assembling the network…