DfI Transport and Road Asset Management (TRAM)
DfI TRAM Road Asset Management – Structures Framework
The procurement contact named on the official notice.
Tenders must be submitted electronically via the relevant Call for Tender (CfT) opportunity on eTendersNI, website details immediately below. Paper submissions will not be accepted or considered and will be rejected by the Contracting Authority. The tender documents are available with unrestricted and full direct access, free of charge, at: ULR https://etendersni.gov.uk/epps For this procurement, all Supplier Technical and Financial submissions must be uploaded exclusively via Lot 1 (SFT P1 - Project Lot) on the eTendersNI platform. Lot 1 will serve as the single, centralised submission point for all Lots within the Framework. Accordingly, Suppliers must select Lot 1 on eTendersNI (in addition to all other Lots they are tendering for) regardless of whether they are submitting a tender for Lot 1 itself.
The submission route named on the official notice.
This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.
This tender notice is for the award of a public contract through an open procedure in accordance with section 20(1) and (2)(a) of the PA 2023.
RAM Structures Framework will include the following work activities: A.
Full or partial demolition of structures; B.
Construction of new structures; C.
Scour protection and maintenance works; D.
Earthworks; E.
Culvert upgrades/maintenance including lining and invert repair works; F.
General bridge/structures maintenance; G.
Working in water; H.
Brickwork, blockwork and stonework; I.
Structural concrete construction and/or repairs; J.
Installation of precast beams or box culverts; K.
Structural steelwork including repairs; L.
Inspection assistance M.
Works on or in the vicinity of the Northern Ireland Railways (NIR) network requiring £100,000,000 public liability insurance; N.
TTM on a live trafficked public road network; O.
Associated road restraint systems installation and/or repair (including RRS associated with structures works); P.
Associated Ancillary Works.
Further ancillary works may be asked of the successful Supplier such as: • Surface reinstatement; • Site clearance including vegetation removal; • Pressure grouting; • Sprayed concrete; • Bridge expansion joints; • Structural steel painting; • Temporary works in and/or around water and/or railways; • Waterproofing for structures The Framework will comprise of three area Lots (Work Orders valued up to £750k exc VAT).
A Project Lot will be used to deliver individual NEC ECC projects covering all the geographical areas detailed below (valued between £750,001 and £5m exc VAT).
Area Lots; - STF W1 – Derry and Strabane; Fermanagh & Omagh; Mid-Ulster. - STF E&S1 - Belfast; Lisburn and Castlereagh; Ards and North Down; Newry Mourne, Down and Armagh; Banbridge and Craigavon. - STF N1 - Antrim and Newtownabbey; Causeway Coast and Glens; Mid and East Antrim This Framework will deliver works from Call-Off contracts with an overall cumulative value of £57m (ex VAT) over the four-year term.
If the Contracting Authority is unable, for any reason, to award a new framework or to put in place an alternative regime to replace this Framework on its termination or expiry, any Call-Off Contract established under the Framework may be extended for a further period or periods up to a maximum of 12 additional months.
This may increase the overall cumulative value to £71.25m (ex VAT).
What the supplier must deliver
A Project Lot will be used
A Project Lot will be used to deliver individual NEC ECC projects covering all the geographical areas detailed below (valued between £750,001 and £5m exc VAT).
This Framework will deliver works from Call-Off
This Framework will deliver works from Call-Off contracts with an overall cumulative value of £57m (ex VAT) over the four-year term.
Derived from the notice text — always confirm against the original documents.
What it takes to bid this
Typical UK bid effort for the £10m+ band — an estimate, not a quote.
Qualify & bid/no-bid ~10% · SQ / PQQ ~20% · Written response ~55% · Review & presentation ~15%
Stated in this notice
- Hold at bidInsurance cover (PL / EL / PI)“…ys (NIR) network requiring £100,000,000 public liability insurance; N. TTM on a live trafficked public road network; O. Associat…”
Typical for this category — confirm against the ITT pack
- Hold at bidSSIP-family accreditation (CHAS / Constructionline)
- Hold at bidISO 45001 / H&S policy & CDM competence
- Show at bidNamed site & contract managers with CVs
- Show at bidComparable references / case studies
- Hold at bidFinancial standing (accounts, often ~2× contract value turnover)
- Hold at bidInsurance cover (PL / EL, often PI)
- Show at bidSocial value commitments
Hold at bid = pass/fail conditions of participation. Show at bid = scored in the quality response. Plan for delivery = contract obligations from day one.
Make the case to bid
Reveal who to approach at DfI Transport and Road Asset Management (TRAM), and generate a go-to-market strategy from their news, accounts and people.
The full intelligence dossier
Our agent reads DfI Transport and Road Asset Management (TRAM)’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Ask me about this tender, the buyer, who wins their work, or whether you should bid.
- OCID
- ocds-h6vhtk-05dc12
- Stage
- tender · Open
- Source
- Find a Tender
- Buyer ref
- 061253-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
DfI Transport and Road Asset Management (TRAM)’s tender network
Assembling the network…