RFP QuestBeta
ClosedStage · tender

SCOTIA GAS NETWORKS LIMITED

FW Supply & Install - SGN Energy Management Solar PV - 0324

EnergyCPV 09330000
Value£1.5m
Deadline24 Mar 2023
Published22 Feb 2023
RegionNationwide
Timeline
Published 22 Feb 2023ClosedCloses 24 Mar 2023
Who to contact
Lois Clubley
lois.clubley@sgn.co.uk
+44 2394280475

The procurement contact named on the official notice.

How to submit
Open the submissions portal

The submission route named on the official notice.

Contract value in context
£1.5mtotal contract value
median £600k
this tender£0£31.8m

This sits in the upper-middle of the Petroleum, Fuel & Energy Products band — a substantial contract for the sector. Based on 3,437 valued Petroleum, Fuel & Energy Products tenders in our corpus.

When this comes round again

SCOTIA GAS NETWORKS LIMITED has published 20 notices across all categories.

Which is the argument for getting on the list rather than winning this one. The incumbent is rarely the last winner — it is the roster. See the retention odds by category →


You'll hear when SCOTIA GAS NETWORKS LIMITED publishes Petroleum, Fuel & Energy Products work again. One email per notice, unsubscribe in one click. We don’t use your address for anything else.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

The project includes works to provide solar PV renewable energy installations to multiple sites, these works may affect minimally the existing the electrical services affected by the installation at each Site.

The above includes; • Full completion of the pre-start surveys as detailed further in this specification • The design of the solar PV renewable energy installation, a minimum 40% reduction in electricity purchasing requirements should be achieved through design, although area available for the installation will be taken into account during the design phase. • Extension of existing or installation of new LV power supplies to serve the installation and achieve a compliance. • Making good the building fabric to ensure a neat and tidy installation • Remove all redundant equipment and materials from site.

Where possible, recycling waste material and equipment.

The works include the removal, supply, installation, testing and commissioning of the materials, plant, and equipment works as detailed herein and on the associated project documentation, to enable a complete safe working system.

The installations are to be complete in every respect including all ancillaries, whether specifically mentioned or not.

Requirements

What the notice asks for

01

The project includes works to provide solar

The project includes works to provide solar PV renewable energy installations to multiple sites, these works may affect minimally the existing the electrical services affected by the installation at each Site.

02

The design of the solar PV renewable

The design of the solar PV renewable energy installation, a minimum 40% reduction in electricity purchasing requirements should be achieved through design, although area available for the installation will be taken into account during the design phase.

03

Making good the building fabric to ensure

Making good the building fabric to ensure a neat and tidy installation.

04

The works include the removal, supply, installation

The works include the removal, supply, installation, testing and commissioning of the materials, plant, and equipment works as detailed herein and on the associated project documentation, to enable a complete safe working system.

Sentences from the notice that state an obligation, surfaced automatically and shown in the order they appear. Not an exhaustive list — always confirm against the tender documents.

Buyer intelligence

Make the case to bid

Reveal who to approach at SCOTIA GAS NETWORKS LIMITED, and generate a go-to-market strategy from their news, accounts and people.

Sign up free to unlock buyer intelligence

Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.

Deep dive · beta

The full intelligence dossier

Our agent reads SCOTIA GAS NETWORKS LIMITED’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.

Sign up free to run a deep dive

Five included while we’re in beta, and the agent asks before it spends on any paid step.

Source & provenance
OCID
ocds-h6vhtk-03a760
Stage
tender · Open
Source
Find a Tender
Buyer ref
005250-2023
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Petroleum, Fuel & Energy Products

This view needs WebGL, which this browser has turned off.

SCOTIA GAS NETWORKS LIMITED’s tender network

This view needs WebGL, which this browser has turned off.
Also open now

Similar open tenders

Photovoltaic (PV) Installations Little Marlow and Maidenhead

THAMES WATER UTILITIES LIMITED

Closes 15 Sept 2026Energy
Value not publishedValue

PfH Energy Supply and Services DPS

Procurement for Housing

Closes 22 Feb 2029Construction
£500.0mValue