BALFOUR BEATTY CIVIL ENGINEERING LIMITED

A66 - FRC

Historical · ContractNo open deadline

Historical: no longer open for bids.

01/ The notice

Key facts

Value
Not statedValue not stated in source
Deadline (UK time)
Fri 6 Mar 2026, 12:00 GMTA deadline does not apply to this historical notice. The source records Fri 6 Mar 2026, 12:00 GMT, which is not an open deadline.
Published
20 Feb 2026
Region
Not stated

02/ The brief

What the notice says

Not fully read: this is the notice text; attached documents are not read.

The package covers, but is not limited to, the following structural components:

Abutments, including bearing shelves, backwalls, and associated retaining elements

Wing walls including reinforcement details, formwork, concrete placement, and tie-ins

Central pier, where applicable, based on design

Placing of pre-cast deck panels, including the stitched slab, diaphragms, upstands and any longitudinal or transverse construction joints

Installation precast parapet plinths and associated edge thickening or upstand requirements

Any additional minor or connecting works required to complete the structure to specification

In addition to the primary structural FRC installation, the package includes full responsibility for all associated temporary works and ancillary requirements, including:

Temporary works design, supply and installation, inclusive of falsework, propping, support systems, working platforms and stability measures

Testing and control activities, including concrete cube testing, slump testing, rebar inspection hold points, and pour records

Curing systems and processes including curing membranes, coverings, and controlled curing regimes

Concrete temperate monitoring, including the provision and management of sensors where required

Access and edge protection systems including surface preparation, treatment, defect rectification (if required) and final concrete finishes

All labour, plant, materials, consumables, and supervision to deliver a fully compliant structure

The contractor will be required to coordinate their works with adjacent section 3b activities and provide all necessary RAMS, ITPs, quality records, and as-built-information to support completion of Centre Parcs overbridge.

03/ Classification

CPV codes

Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.

  • 45262310
  • 45000000 45200000 45260000 45262000

04/ History

Releases of this notice

One release held, oldest first. Dates are UK time.

  1. 20 Feb 2026
    Contract notice

    Contract notice published 20 February 2026.

    Release 15b9dd11-eb63-4e2b-938a-111669d769b5

    View this release on Contracts Finder (opens in a new tab)

05/ Limits

What the source does not tell us

  • The source does not state a usable value.
  • Only one release is held, so there is no change history.

06/ Questions

About this notice

BALFOUR BEATTY CIVIL ENGINEERING LIMITED published this notice.

Value not stated in source.

07/ Related

Where to go next

These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.

Reference
15b9dd11-eb63-4e2b-938a-111669d769b5
Source
Contracts Finder
Stage
contract · Contract
Last verified
Sun 5 Apr 2026, 18:05 BST
Read at
Fri 16 Oct 2026, 22:31 BST

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

RFP Quest logo — RFP software, RFP platform and RFP tools

Built on published notices from Find a Tender and Contracts Finder.

15 minutes · RFP Quest

Book a Demo