Skip to main content

Find a Tender · Historical

NETWORK RAIL INFRASTRUCTURE LIMITED

East West Rail - Further Critical Works

Historical · AwardedNo open deadline

Historical: no longer open for bids.

01/ The notice

Key facts

Value
Not statedValue not stated in source
Deadline (UK time)
No open deadlineA deadline does not apply to this historical notice.
Published
14 Oct 2026
Region
Not stated

02/ The brief

What the notice says

Not fully read: this is the notice text; attached documents are not read.

The requirement consists of a combination of design services and construction works which are needed to increase the rail network’s operational capacity for progressive delivery of benefits from early 2030s and to support the rail networks’ early operational response to a new theme park which is set to open in 2031.

The indicative high-level scope relating to this transparency notice refers only to the Marston Vale Line between Bletchley and Stewartby, and on the OXD line between Oxford Parkway and Bletchley, and Milton Keynes Central Station design services and works (subject to funding and any other required internal and external approvals):

- Undertaking the design for critical rail systems upgrade and required station packages on the Martson Vale and OXD lines to support a higher capacity railway as far as Stewartby.

- Re-signalling works, track upgrades including double tracking between Bletchley and Fenny Stratford and a new layout at Stewartby, passing loops, electrification, level crossing closures, bridge and underpass works, station works at Winslow, Bletchley and Stewartby, earthworks and drainage resilience.

- Discharge of new planning consents under the EWRco Development Consent Order (DCO) and integration with TWAO conditions and commitments in support of the delivery of the Marston Vale Line Core Works (MVLCW).

- Delivery of enabling works such as site clearance, compound set up, Flood Storage Areas (CFSA), Environmental Compensation Sites (ECS) and utility diversions

- Integration of timetabling modelling between MVLCW and this scope. This includes both service outcomes and temporary arrangements including possession planning.

It is currently anticipated, based on the current information, that the estimated final costs of these works and services will amount to a maximum of £650m (excluding VAT).

This scope of this Transparency Notice does not include several of the final station arrangements on the Martson Vale signalling area, or the option for a train maintenance depot on the OXD lines. The requirements for this will be procured separately. Information on the wider East West Rail project can be found at East West Rail | Project overview.

The in scope design services and works will require significant coordination and integration with the ongoing works currently being delivered by the East West Rail Alliance (EWRA) on the Marston Vale Line, referred to as the Marston Vale Line Core Works (MVLCW). This includes design integration, as well as the management and delivery of the works on the same site, at the same time and, on the same rail systems, therefore Network Rail consider this an extension of existing work.

An overview of the existing MVLCW scope includes:

- Multiple level crossing closures and bridge work (including BF01) on the Marston Vale Line

- Signalling and control system alterations associated with level crossing works and associated track works

- Other coordinated bridge works

- Timetable development works

- Options for safety enhancements at stations including tactile edges, extension of existing station lighting, announcement, wayfinding and customer information systems if required

- Resilience infrastructure works including track, drainage and earthworks

03/ Classification

CPV codes

Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.

  • 45000000

04/ History

Releases of this notice

One release held, oldest first. Dates are UK time.

  1. 14 Oct 2026
    Notice

    Notice published 14 October 2026.

    Release 096761-2026

    View this release on Find a Tender (opens in a new tab)

05/ Limits

What the source does not tell us

  • The source does not state a usable value.
  • Only one release is held, so there is no change history.

06/ Questions

About this notice

NETWORK RAIL INFRASTRUCTURE LIMITED published this notice.

Value not stated in source.

07/ Related

Where to go next

These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.

Reference
ocds-h6vhtk-078703
Source
Find a Tender
Stage
award · Awarded
Last verified
Wed 14 Oct 2026, 23:18 BST
Read at
Fri 16 Oct 2026, 20:58 BST

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

RFP Quest logo — RFP software, RFP platform and RFP tools

Built on published notices from Find a Tender and Contracts Finder.

15 minutes · RFP Quest

Book a Demo