01/ The notice

Key facts

Value
£500,000Estimated value stated in the notice
Deadline (UK time)
Fri 5 Jun 2026, 16:00 BSTA deadline does not apply to this historical notice. The source records Fri 5 Jun 2026, 16:00 BST, which is not an open deadline.
Published
29 May 2026
Region
South East

02/ The brief

What the notice says

Not fully read: this is the notice text; attached documents are not read.

NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.

We are seeking a specialist subcontractor to undertake the following works within the NC2A section:

The Subcontract Works includes for the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely complete the construction and handover of Highways/ footpaths works, as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The Subcontractor will be responsible for the temporary works design and temporary works construction as further detailed in this document.

The subcontractor will be responsible for all permanent and temporary works relating to the Highways realignment unless otherwise excluded. The works included as part of this scope to be delivered by the subcontractor are:

- Site clearance including Removal of existing drainage, kerbs, footpath, highway pavement, verges within permanent design location.

- Earthworks including excavation to formation, soft spot treatment if required.

- Drainage system, including temporary excavations, supply and installation of chambers, gullies, headwalls, carrier drains, filter and fin drains, fin drains, ditches, hydro brake system, non-return valve connection to existing drainage systems.

- Service ducts: including supply and installation of service ducts, connections and chambers.

- Road formation (asphalt surfacing by others): this includes supply and installation of geotextile separation materials highways and footways kerbs. Installation of capping and subbase layers

Please express your interest within this package.

03/ Classification

CPV codes

Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.

  • 45000000 45200000 45230000 45233000
  • 45233130

04/ History

Releases of this notice

One release held, oldest first. Dates are UK time.

  1. 29 May 2026
    Contract notice

    Contract notice published 29 May 2026.

    Release 1d61fc20-e220-40a0-b5ce-d9c847425012

    View this release on Contracts Finder (opens in a new tab)

05/ Limits

What the source does not tell us

  • Only one release is held, so there is no change history.

06/ Questions

About this notice

Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3 published this notice.

Estimated value stated in the notice: £500,000.

07/ Related

Where to go next

These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.

Reference
1d61fc20-e220-40a0-b5ce-d9c847425012
Source
Contracts Finder
Stage
contract · Contract
Last verified
Sun 31 May 2026, 01:01 BST
Read at
Sat 17 Oct 2026, 01:03 BST

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

RFP Quest logo — RFP software, RFP platform and RFP tools

Built on published notices from Find a Tender and Contracts Finder.

15 minutes · RFP Quest

Book a Demo