Contracts Finder · Historical
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
EKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
Historical: no longer open for bids.
01/ The notice
Key facts
- Value
- £500,000Estimated value stated in the notice
- Deadline (UK time)
- Tue 30 Jun 2026, 16:00 BSTA deadline does not apply to this historical notice. The source records Tue 30 Jun 2026, 16:00 BST, which is not an open deadline.
- Published
- 23 Jun 2026
- Region
- South East
02/ The brief
What the notice says
Not fully read: this is the notice text; attached documents are not read.
NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture.
We are seeking a specialist subcontractor to undertake the following works within the NC2A section:
The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely and correctly complete the installation and handover of Precast Concrete UTX (Under Track Crossing) chamber system and adjoining ducts , as described in the specifications, drawings, HS2 standards Requirements and local authority specifications.
The UTX system comprises segmented precast concrete chambers with precast concrete covers, seated on a precast concrete base. The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor. Contractor will Undertake excavation works to the UTX duct formation level, subcontractor will complete excavation for installation of UTX Chambers and ducts.
The Subcontract works include, but are not limited to:
Dewatering of excavations as required.
Provision of edge protection to ensure that excavation is safe for works
Protection of all existing assets
Setting out the UTX in accordance with the design and specifications, using primary control points provided by the Contractor.
Transfer UTX Chambers from Laydown Area to point of installation
Installation of the UTX system comprising segmented precast concrete chambers using methodology provided in detailed design
Install all units onto the precast concrete base slabs provided by the Contractor.
Install the full precast assembly, including the Precast concrete chamber segments and Precast concrete covers
Install all components in accordance with the approved drawings, specified line and level, and manufacturer's instructions.
Supply and install all associated ducting, ensuring compliance with project specifications and drawings.
As part of installation, CBGM / Cast in situ concrete - minimum FND4 concrete around UTX and ducts to be done by Subcontractor
Testing and handover
03/ Classification
CPV codes
Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.
- 44000000 44100000 44110000 44114000 45000000 45100000 45110000 45112000 45200000 45230000 45234000
- 44114200 45112400 45234123
04/ History
Releases of this notice
One release held, oldest first. Dates are UK time.
- 23 Jun 2026Contract notice
Contract notice published 23 June 2026.
Release 183433b7-20fc-4d4b-827c-d1e515bf47bf
View this release on Contracts Finder (opens in a new tab)
05/ Limits
What the source does not tell us
- Only one release is held, so there is no change history.
06/ Questions
About this notice
07/ Related
Where to go next
These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.
- Reference
- 183433b7-20fc-4d4b-827c-d1e515bf47bf
- Source
- Contracts Finder
- Stage
- contract · Contract
- Last verified
- Thu 25 Jun 2026, 01:03 BST
- Read at
- Sat 17 Oct 2026, 01:04 BST
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Built on published notices from Find a Tender and Contracts Finder.