Highway Maintenance Term Contracts (232621HE)
This is a large award for Construction — above three-quarters of comparable contracts. Based on 64,002 valued Construction tenders in our corpus.
London Borough of Ealing publishes Construction work continuously — 200 notices, roughly one every 1 day. This is a stream to watch, not a cycle to wait for.
43% of London Borough of Ealing’s awards go to a supplier it has used before.
Which is the argument for getting on the list rather than winning this one. The incumbent is rarely the last winner — it is the roster. See the retention odds by category →
Lot 1 - Highways Maintenance Works (HMW) Reactive maintenance such as patching, pothole repair, and footway repaving Emergency highway maintenance, with callout availability 24 hours a day and 365 days a year Planned maintenance such as resurfacing, repaving, gully treatments and so on Full regime of winter maintenance Drainage maintenance such as gully cleansing Signing and lining for carriageways, footways, cycle tracks and other areas as required, including manufacture and maintenance of signs Vehicle crossings for residential and commercial sites Act as Principal Contractor for the above works, as per Construction (Design & Management) Regulations 2015 (CDM) <end of Lot 1 description> Lot 2 - Highway & Civil Improvements (HCI) Highways engineering works such as traffic calming, traffic management, high street improvements, cycle and walking facilities, and regeneration schemes Works associated with planning approvals such as section 38/278 works, and section 106 or CIL-funded schemes Parking schemes such as Controlled Parking Zone implementation Signage and markings for carriageways, footways, cycle tracks and other areas as part of projects, including manufacture and maintenance of signs Structural and civil engineering works Utilities and drainage works Controlled Parking Zone including signing and carriageway lining Footway and carriageway works to housing estates, schools or parks Site set-up and pre-construction activities including surveys, setting out, and temporary traffic management Act as Principal Contractor for the above works, as per Construction (Design and Management) Regulations 2015 (CDM)
What this notice demands of you
1 named, none in explicit obligation language. Each one is quoted from the notice.
Act as Principal Contractor for the above works, as per Construction (Design and Management) Regulations 2015 (CDM)
Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.
Make the case to bid
Reveal who to approach at London Borough of Ealing, and generate a go-to-market strategy from their news, accounts and people.
Free to start. Named contacts come from published notices; the strategy is generated from the buyer’s news, accounts and people.
The full intelligence dossier
Our agent reads London Borough of Ealing’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.
Five included while we’re in beta, and the agent asks before it spends on any paid step.
- OCID
- ocds-h6vhtk-06b570
- Stage
- planning · Planning
- Source
- Find a Tender
- Buyer ref
- 056404-2026
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Who wins this kind of work
The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.
Top suppliers & buyers in Construction
London Borough of Ealing’s tender network