The project is required to provide Foul Water Drainage as part of the ongoing development works at Samlesbury Enterprise Zone. The successful contractor will be required to provide final design for the system, construction of a new foul pumping station and approximately 2,750m of rising main. Cundall (Engineering Consultancy) have undertaken the initial design for the foul water drainage system, and this has been approved by United Utilities. The final design and construction works will be carried out in accordance with all United Utilities standards therefore the successful contractor will be required to obtain all necessary approvals for the works from United Utilities, and this will be a requirement for practical completion. The new foul pump station will be constructed on private land, which is adjacent to Sir Frederick Page Way, however the rising main will need to be constructed in the adopted highway. The successful contractor is responsible for traffic management and gaining all necessary consents from the Highway Authority in order construct the rising main. The final connection into the United Utilities receptor will be across United Utilities land. On completion, the successful contractor will also be required to provide planned maintenance for an initial period of 12 months. This period may be extended by instruction from the Project Manager. The contract is anticipated to commence in June 2026 and the term of the contract will be 8 months, with an additional twelve months minimum maintenance period. This may be extended further if the system is not adopted by United Utilities in the first twelve months. United Utilities shall adopt the site when 50% of the site is occupied.

Buyer
Lancashire County Council
Contract Value
Value not disclosed
Deadline
9 days left
13 Mar 2026
Published
4 Feb 2026
Interactive

About This Lancashire County Council Contract

This open tender from Lancashire County Council was published in 2026. The Salmesbury Waste Water Pumping System Construction contract with a submission deadline of 13 March 2026.

This UK government contract opportunity is part of the public procurement process, openly available via Find a Tender.

Contract Analytics

Key Metrics

0Match
0%
Match
73%
Urgency
30%
Value

Sector Distribution

General100%

Contract Timeline

4 Feb

Published

Current

Open for Bids

13 Mar

Deadline

Value Analysis

Contract value not disclosed

Market Activity

-16%

UK tender activity (12 months)

Salmesbury Waste Water Pumping System Construction - Scope of Work

0 phases • 0 requirements • 0 capabilities
  • The project is required to provide Foul Water Drainage as part of the ongoing development works at Samlesbury Enterprise Zone. The successful contractor will be required to provide final design for the system, construction of a new foul pumping station and approximately 2,750m of rising main.
  • Cundall (Engineering Consultancy) have undertaken the initial design for the foul water drainage system, and this has been approved by United Utilities. The final design and construction works will be carried out in accordance with all United Utilities standards therefore the successful contractor will be required to obtain all necessary approvals for the works from United Utilities, and this will be a requirement for practical completion.
  • The new foul pump station will be constructed on private land, which is adjacent to Sir Frederick Page Way, however the rising main will need to be constructed in the adopted highway. The successful contractor is responsible for traffic management and gaining all necessary consents from the Highway Authority in order construct the rising main.
  • The final connection into the United Utilities receptor will be across United Utilities land.
  • On completion, the successful contractor will also be required to provide planned maintenance for an initial period of 12 months. This period may be extended by instruction from the Project Manager.
  • The contract is anticipated to commence in June 2026 and the term of the contract will be 8 months, with an additional twelve months minimum maintenance period. This may be extended further if the system is not adopted by United Utilities in the first twelve months. United Utilities shall adopt the site when 50% of the site is occupied.

Ask the AI assistant for deeper analysis of this scope

Contract Value

Fixed PriceSingle contract value agreed upfront
Value not disclosed

Key Dates

Important deadlines and milestones

UK Time

Notice Published

Tender opportunity made public on Find a Tender

Wed, 4 Feb 2026
Passed

Submission Deadline

Next

Final deadline for bid submission

Fri, 13 Mar 2026at 12:00
9 days
remaining

What This Lancashire County Council Contract Means

For Citizens

This is a public procurement by Lancashire County Council. All UK government contracts are publicly accessible for transparency.

For Businesses

This Lancashire County Council tender is open for bids. Deadline: 13/03/2026. Submit your proposal via Find a Tender.

Related Opportunities

Sector Overview

Buyer Network

Your Match Score

Complete your profile for personalized match scoring

Company Match Analysis

Analyze how well this tender matches your company profile and capabilities.

Market Activity

+36%

UK tender activity (12 months)

Lancashire County Council

Contact Information

View All Contracts
Lancashire County Council
Spending trends, sector breakdown & more →

Quick Facts

Stage
Tender
Status
active
CPV Codes
0

Reference ID

ocds-h6vhtk-0646ad

Win More UK Government Contracts

RFP.quest helps UK businesses find and win public sector tenders. Our AI platform analyzes requirements, identifies gaps, and helps craft winning proposals.

UK tender data from Find a Tender under the Open Government Licence. Powered by RFP.quest.

Tender Assistant

I can help you understand this Lancashire County Council contract:

• Requirements and evaluation criteria • Risks and gaps analysis • Buyer and market context • Related opportunities

Ask me anything about "Salmesbury Waste Water Pumping System Construction"!

Powered by CopilotKit