Contracts Finder · Historical
DEOP AA Ranges (Fingringhoe) Enhancement-CF
Historical: no longer open for bids.
01/ The notice
Key facts
- Value
- £7,415,837Estimated value stated in the notice
- Deadline (UK time)
- Thu 15 Jul 2021, 12:00 BSTA deadline does not apply to this historical notice. The source records Thu 15 Jul 2021, 12:00 BST, which is not an open deadline.
- Published
- 27 Mar 2022
- Region
- South West
02/ The brief
What the notice says
Not fully read: this is the notice text; attached documents are not read.
Fingringhoe and Middlewick Range facilities provide live fire capability and training support for over 3,500 personnel in 16 Air Assault Brigade and Units in the wider South East area.
Middlewick Range is situated on the outskirts of Colchester, postcode C05 7LX, and has been announced for disposal. To enable this disposal the capability will be transferred to Fingringhoe, with the site due for development in 21/22.
The additional live firing training capacity, that will be created by the supplementary range facilities at Fingringhoe, is an enduring requirement for the MOD.
The aim of the Project is to provide two additional firing ranges and supporting facilities at the Fingringhoe Range Complex to allow for the closure, and subsequent disposal, of 85 hectares at Middlewick Range.
The objectives of the Project are to:
a. Provide adequate range facilities to support use of the ranges, scaled for the number of personnel. The facility must support 2 x 30 personnel troops, workshop and store, toilets and vehicle parking and be Technical Advisory Section (TAS) compliant. The existing track is to be widened and resurfaced. Utilities shall be required.
b. Ensure that, outside of agreed periods, disruption to the operation of Fingringhoe Ranges is kept to a minimum during the construction period.
c. Ensure that the works are designed, constructed, commissioned and maintained to the appropriate standards and regulations during the construction and subsequent defects phase.
d. Optimise Through-Life Costs.
e. Link the Project and its delivery to the End Users' operational outputs.
f. The design of all engineering service systems shall be energy efficient and emphasise simplicity of layout and control. They shall include standard, tried and tested components to achieve a design life of 15 years' subject to planned maintenance and replacement required.
g. Ensure that new facilities have a minimum structural design life of 60 years, and free from major maintenance for 25 years
03/ Classification
CPV codes
Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.
- 45000000
04/ History
Releases of this notice
One release held, oldest first. Dates are UK time.
- 27 Mar 2022Contract notice
Contract notice published 27 March 2022.
Release 8c355aca-f61b-48f5-81d7-a4e9f34817c7
View this release on Contracts Finder (opens in a new tab)
05/ Limits
What the source does not tell us
- Only one release is held, so there is no change history.
06/ Questions
About this notice
07/ Tender hubs
More South West tenders like this
This notice is closed and kept here as a record. These pages list the live notices in the same subject, buyer or place. Chosen by a fixed rule on the notice’s title, buyer and region.
08/ Related
Where to go next
These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.
- Reference
- 8c355aca-f61b-48f5-81d7-a4e9f34817c7
- Source
- Contracts Finder
- Stage
- contract · Contract
- Last verified
- Thu 9 Apr 2026, 16:17 BST
- Read at
- Fri 23 Oct 2026, 05:27 BST
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Built on published notices from Find a Tender and Contracts Finder.