Skip to main content

Find a Tender · Forecast

Housing Solutions

Housing Solutions - Supply and installation of Kitchens and Bathrooms

Forecast · plannedNo open deadline

Forecast: a planned procurement that is not yet at tender stage.

01/ The notice

Key facts

Value
£6,500,000Estimated value stated in the notice
Deadline (UK time)
Fri 15 Aug 2025, 12:00 BSTA deadline does not apply to this forecast notice. The source records Fri 15 Aug 2025, 12:00 BST, which is not an open deadline.
Published
22 May 2025
Region
Not stated

02/ The brief

What the notice says

Not fully read: this is the notice text; attached documents are not read.

Scope and delivery of the work

The work consists of replacement kitchens and bathrooms. We need a contractor to supply and fit these consistent with the specification attached and in the case of kitchen replacements, liaise with both Housing Solutions and the kitchen supplier to carry out joint design surveys. We currently install Howdens kitchens (Greenwich Range) and will most likely continue to fit these. We do not have a direct relationship with Howdens and expect you to negotiate your own prices with them and allow for the supply in your basket rate. We assume you will engage a Resident Liaison Officer (RLO) and will liaise directly with the residents regarding, surveys, installation dates, general updates, correspondents, access arrangements and any issues that arise before, during and after the works.

Programme scale and duration

We intend appointing for an initial contract period of 3 years with the option to extend for a further two years on a 1 + 1 basis. We operate a two year budget but estimate our 2026-27 - 2028-29 budget will be up to £4m for kitchens and bathrooms and we expect to maintain similar budgets in future years. Therefore we estimate the max term spend to be up to £6.5m.

Geographical distribution

Housing Solutions was originally formed from transferred Local Authority homes in Maidenhead. These still form the majority of our homes, although there are post-1995 developments in Reading, High Wycombe, Slough, Bracknell, Farnborough, Wokingham, and other locations in Berkshire and Buckinghamshire.

Our 2026-27 programme could consist of approximately 300-500 homes across our estate. Around 70% of our stock are within the Maidenhead area, however there are some homes in other areas like Reading, Farnborough, Wokingham, Slough, Windsor, Bracknell.

Programming

We will leave programming of the work to you. We may have a small number of high-priority cases needing to be done earlier, but in general we would give you our address list for each financial year (April to March) and you can determine your own programme to deliver it. We expect that once work on an individual property have commenced, they are completed within 10 working days for kitchens and 8 working days for bathrooms where practicable and these targets will form part of the KPI suite. The priority is to give the tenant clear timescales, which are met. We would expect essential services (kitchen sink, heating, electricity gas and water) to be restored at the end of each working day.

CDM

We will appoint the Quoin Consultancy as Principal Designer, you will be appointed Principal Contractor. We assume you will prepare the key documents and Quoin will check them against the regulations.

Pricing model

Works will be priced on basket rates per the attached specification with variation on M3NHF SOR Version 7.0. There may be an option to put forward an additional / alternative bid that features another brand (not Howdens).

Ordering and payment

• Works will be issued on an individual order and variations must be approved in line with the variations process before they are actioned. Final invoiced amounts must be raised within 2 months of completion, to avoid a backlog of invoices.

• Invoices will not be processed until all certification has been received (Uploaded into a portal or drop box) including, but not limited to electrical certification (installation & minor works), gas safety certificate, kitchen designs, customers selection surveys and customer satisfaction surveys.

• You will also be expected to update our works portal (Connect) so the progress of all works can be monitored throughout the duration of the contract.

Form of contract

The form of contract will be the JCT Minor Works (MW2024)

KPIs

• Installations completed within agreed periods

• 100% Customer satisfaction feedback.

• 100% Quality inspection pass rate

• Adherence to programme prepared by contractor

• Client portal updates.

03/ Classification

CPV codes

Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.

  • 45211310
  • 45421151
  • 39141400

04/ History

Releases of this notice

3 releases held, oldest first. Dates are UK time.

  1. 30 Apr 2025
    Planning notice

    Planning notice published 30 April 2025.

    Deadline in this release: Mon 14 Jul 2025, 12:00 BST.

    Release 018109-2025

    View this release on Find a Tender (opens in a new tab)
  2. 22 May 2025
    Planning notice update

    Planning notice update published 22 May 2025. Stated change: We have just noticed that there was an error when the original UK3 Notice was published via our nominated e-tender portal provider last month. It would seem that the 2 documents that had been shared for comment failed to be uploaded - please find them attached now and pass us your thoughts. Note: Likely timelines for this procurement have been pushed back to accommodate the anticipated market-insights on the draft Service Specification & Pricing Matrix documents shared.

    Deadline in this release: Fri 15 Aug 2025, 12:00 BST.

    Release 024613-2025

    View this release on Find a Tender (opens in a new tab)
  3. 22 May 2025
    Planning notice update

    Planning notice update published 22 May 2025. Stated change: A draft Pricing Matrix and draft Service Specification have been included with this notice for comment - closing date for comments will be 12 noon on 20th June 2025.

    Deadline in this release: Fri 15 Aug 2025, 12:00 BST.

    Release 025306-2025

    View this release on Find a Tender (opens in a new tab)

05/ Limits

What the source does not tell us

  • None recorded for the fields above. Attached documents are not read, so this is not a full account of the tender.

06/ Questions

About this notice

Housing Solutions published this notice.

Estimated value stated in the notice: £6,500,000.

07/ Tender hubs

More kitchen and bathroom replacement tenders like this

Pages that list the live notices in the same subject, buyer or place, with recent winners. Chosen by a fixed rule on the notice’s title, buyer and region.

08/ Related

Where to go next

These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.

Reference
ocds-h6vhtk-050a83
Source
Find a Tender
Stage
planning · planned
Last verified
Mon 6 Apr 2026, 18:52 BST
Read at
Fri 23 Oct 2026, 04:51 BST

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

RFP Quest logo — RFP software, RFP platform and RFP tools

Built on published notices from Find a Tender and Contracts Finder.

15 minutes · RFP Quest

Book a Demo