Find a Tender · Historical
Laser Induced Desorption System for Measuring First Wall Retention in STEP
Historical: no longer open for bids.
01/ The notice
Key facts
- Value
- Not statedValue not stated in source
- Deadline (UK time)
- No open deadlineA deadline does not apply to this historical notice.
- Published
- 16 Sep 2026
- Region
- Not stated
02/ The brief
What the notice says
Not fully read: this is the notice text; attached documents are not read.
UK Fusion Energy Ltd (UKFE) is seeking to appoint a supplier to undertake the concept design of a system capable of in-situ quantification of tritium retention within plasma-facing (first wall) materials for the Spherical Tokamak for Energy Production (STEP) programme.
STEP is the UK's flagship fusion energy programme, sponsored by the Department for Energy Security and Net Zero (DESNZ), and aims to design and construct the UK's first prototype fusion power plant capable of demonstrating net energy production, fuel self-sufficiency and a viable route to plant maintenance. UKFE, a wholly owned subsidiary of the United Kingdom Atomic Energy Authority (UKAEA), is responsible for delivering the programme.
A key challenge for future fusion power plants is the management of tritium, which serves as a fuel for the deuterium-tritium fusion reaction. Tritium is both radioactive and scarce, making accurate measurement of its retention within plasma-facing components essential to demonstrating fuel self-sufficiency, supporting tritium accountancy, and monitoring the condition of first wall materials throughout plant operation.
The successful supplier will develop a concept design for a measurement system capable of operating within the demanding environment of a fusion power plant, taking into account constraints such as neutron radiation, strong magnetic fields, thermal loading, limited installation space, and exposure to radioactive materials.
This procurement represents the initial concept design phase of a wider programme of work. Subject to future funding and programme approvals, the outputs of this contract are expected to inform subsequent detailed design activities, technology maturation, de-risking and testing, and ultimately the development of an integrated tritium measurement system for deployment within the STEP tokamak.
03/ Classification
CPV codes
Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.
- 71300000
- 71320000
- 71600000
- 73100000
- 73111000
- 73120000
04/ History
Releases of this notice
3 releases held, oldest first. Dates are UK time.
- 27 Jul 2026Tender notice (UK4)
Tender notice (UK4) published 27 July 2026.
Deadline in this release: Mon 24 Aug 2026, 12:00 BST.
Release 070950-2026
View this release on Find a Tender (opens in a new tab) - 20 Aug 2026Tender notice (UK4)
Tender notice (UK4) published 20 August 2026. Stated change: This notice has been amended due to a deadline extension for responses to 12pm 7th September 2026.
Deadline in this release: Mon 7 Sep 2026, 12:00 BST.
Release 079466-2026
View this release on Find a Tender (opens in a new tab) - 16 Sep 2026Notice
Notice published 16 September 2026. The source does not state what changed.
Release 087860-2026
View this release on Find a Tender (opens in a new tab)
05/ Limits
What the source does not tell us
- The source does not state a usable value.
06/ Questions
About this notice
08/ Related
Where to go next
These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.
- Reference
- ocds-h6vhtk-06d4a1
- Source
- Find a Tender
- Stage
- award · Awarded
- Last verified
- Wed 23 Sep 2026, 08:12 BST
- Read at
- Thu 22 Oct 2026, 22:16 BST
Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.
Built on published notices from Find a Tender and Contracts Finder.