Skip to main content

Find a Tender · Forecast

NETWORK RAIL INFRASTRUCTURE LIMITED

Purchase of Railway Signalling Training Unit

Forecast · PlanningNo open deadline

Forecast: a planned procurement that is not yet at tender stage.

01/ The notice

Key facts

Value
£100,000Estimated value stated in the notice
Deadline (UK time)
No open deadlineA deadline does not apply to this forecast notice.
Published
5 Jan 2026
Region
Not stated

02/ The brief

What the notice says

Not fully read: this is the notice text; attached documents are not read.

Network Rail Southern Region Market Enquiry

Network Rail would like to purchase a Railway Signalling Training Unit for Signal Engineers and Technicians for periodic familiarisation, training and general simulated know-how for operating signals on the Network Rail infrastructure.

Purpose

There will be a wide range of users for this equipment; from new employees starting off on their railway career up to advanced Signalling Technicians who will need occasional refresher opportunities and development of skills for new processes and methodologies or because of a change in the track access. Operatives need a good knowledge and skills with signals which will improve safety and operational performance.

Operatives are likely to use the facility 2 or 3 times a month for familiarisation and testing and generally will use it for relatively short periods of time – maybe up to 90 minutes a time. Often it will be a single person entering but occasionally there will also be a supervisor and maybe a third person so the design should consider space for up to 3 or 4 persons at a time.

Network Rail standard NR/L2/SIG/10027/F02: Surveillance of Signal Engineering Faulting and Maintenance Activities should be considered for the training requirements of the specialists.

Structure

The structure needs to be a stand-alone unit that can be placed at a specific location at a Network Rail depot or operational site. The unit needs to be strong, robust and able to be relocated should Network Rail wish to move the unit over time. The unit can be a strong shed, converted shipping container or something similar. The unit must have a reasonable finish both inside and out including the flooring and it will need to be watertight. It must have an access facility such as a door which must be able to be securely locked when not in use. There is no need necessarily for windows, but they could be considered, however there should be sufficient lighting provided so users can use the unit in a safe environment and work in a comfortable manner. Air vents should be included to enable suitable ventilation. There is no need for heating units to be included although again they could be considered.

Electricity connections with existing Network Rail infrastructure will be provided but the structure will need power connection and suitable wiring, switches sockets etc. embedded within the structure fabric. The electricity connection needs to be safe and suitable for an external location.

Maintenance of the structure should be minimal although the unit should be suitable for use for between 5-10 years.

Fit Out

The unit is to be fitted out with signal equipment provided by the supplier. Hence the supplier should be familiar with the standard type of signalling equipment used on Network Rail track infrastructure. Obviously, the range of signalling equipment is quite wide and so Network Rail would like the supplier to propose a series of design options for Network Rail to consider and select what exactly they would like to see included within the unit.

No software is required for this equipment which can be described as mechanical.

There is no need to include furniture such as a desk or seat to be included in the fit out but there should be sufficient space available should Network Rail wish to add them.

Utilities

As stated, an electrical connection point is required to be included in the design. There is no requirement for natural gas or water.

On-Going Maintenance

Other than during the given warranty where the supplier would be required to make good any defects or omissions, the on-going maintenance including the fit out equipment will be undertaken by Network Rail.

Other Items

There may be the need for some signage such as “Property of Network Rail” and maybe a safety sign for the electric connection. This can be discussed during design clarification.

Delivery

The supplier will be responsible for the delivery and lift of the unit to the specific allocated site on Network Rail’s premises.

03/ Classification

CPV codes

Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.

  • 34632200

04/ History

Releases of this notice

One release held, oldest first. Dates are UK time.

  1. 5 Jan 2026
    Planning notice

    Planning notice published 5 January 2026.

    Release 000357-2026

    View this release on Find a Tender (opens in a new tab)

05/ Limits

What the source does not tell us

  • Only one release is held, so there is no change history.

06/ Questions

About this notice

NETWORK RAIL INFRASTRUCTURE LIMITED published this notice.

Estimated value stated in the notice: £100,000.

07/ Tender hubs

More rail tenders like this

Pages that list the live notices in the same subject, buyer or place, with recent winners. Chosen by a fixed rule on the notice’s title, buyer and region.

08/ Related

Where to go next

These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.

Reference
ocds-h6vhtk-05ff73
Source
Find a Tender
Stage
planning · Planning
Last verified
Sat 4 Apr 2026, 00:11 BST
Read at
Thu 22 Oct 2026, 16:41 BST

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

RFP Quest logo — RFP software, RFP platform and RFP tools

Built on published notices from Find a Tender and Contracts Finder.

15 minutes · RFP Quest

Book a Demo