Skip to main content

Contracts Finder · Historical

Wakefield Council Customer Service

Castleford to Wakefield Greenway Cycleway Bridge Over Live Railway.

Historical · ContractNo open deadline

Historical: no longer open for bids.

01/ The notice

Key facts

Value
£420,850Estimated value stated in the notice
Deadline (UK time)
Thu 17 Aug 2017A deadline does not apply to this historical notice. The source records Thu 17 Aug 2017, which is not an open deadline.
Published
5 Dec 2017
Region
Yorkshire and The Humber

02/ The brief

What the notice says

Not fully read: this is the notice text; attached documents are not read.

As a part of the Castleford to Wakefield Greenway scheme a cycleway bridge is required to cross the existing railway. The crossing position is at the position of an existing bridge which has since been removed. Abutments remain but these are not to be utilised in the design, though the effect of their possible removal must be considered by the designer.

The feasibility report has recommended a 35m span steel bridge on abutments independent and not reliant on the existing abutments.

The contractor is to design and build a 35m span steel cycleway bridge in accordance with the current Design Manual for Roads and Bridges and the Manual of Contract Documents for Highway Works as published by DfT. The design must also include for all requirements of Network Rail in crossing their infrastructure.

The works comprise:

DESIGN STAGE

Ground investigation - scope

Topographical Survey

Environmental Surveys, Statement and Mitigation.

Input to Safety Audits all Stages

C3 and C4 notices and estimates

Liaison with Wakefield Council and outside bodies

Liaison with Network Rail

Network Rail Procedures

Detailed design of the rail bridge including AIP and Category 3 Check.

Signal Sighting Report

Progress meeting attendance

Programme preparation and monthly updates.

Dealing with all technical queries during construction

Network Rail Liaison Design/Query Procedures during Construction.

Construction Phase

1 Construction of the designed bridge.

2 Construction of approximately 400m of 3m wide cycleway on the remains of a dismantled railway and across the new bridge. This cycleway will tie in to the existing cycleways constructed by others.

03/ Classification

CPV codes

Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.

  • 45200000 71322000
  • 45000000 71000000 71300000 71320000

04/ History

Releases of this notice

One release held, oldest first. Dates are UK time.

  1. 5 Dec 2017
    Contract notice

    Contract notice published 5 December 2017.

    Release 2c9d7f68-afbb-4b44-99c3-19c784400620

    View this release on Contracts Finder (opens in a new tab)

05/ Limits

What the source does not tell us

  • Only one release is held, so there is no change history.

06/ Questions

About this notice

Wakefield Council Customer Service published this notice.

Estimated value stated in the notice: £420,850.

07/ Tender hubs

More rail tenders like this

This notice is closed and kept here as a record. These pages list the live notices in the same subject, buyer or place. Chosen by a fixed rule on the notice’s title, buyer and region.

Open now in Rail tenders

08/ Related

Where to go next

These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.

Reference
2c9d7f68-afbb-4b44-99c3-19c784400620
Source
Contracts Finder
Stage
contract · Contract
Last verified
Tue 7 Apr 2026, 20:27 BST
Read at
Fri 23 Oct 2026, 08:17 BST

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

RFP Quest logo — RFP software, RFP platform and RFP tools

Built on published notices from Find a Tender and Contracts Finder.

15 minutes · RFP Quest

Book a Demo