Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler

Suppliers will be required to provide the following services in a cost-effective structure: General Requirements • The Contractor shall supply, install, and maintain all specified equipment at RBFRS locations. • Provision for leasing options, enabling RBFRS to forecast costs, maintain budget compliance, and upgrade or alter equipment in line with operational requirements. • All equipment shall operate from a standard 13-amp power supply, with electrical connections located within 1 metre, and water/drainage connections within 15 metres of installation points. • The Contractor shall provide a fixed monthly price for all services and assets supplied under this contract Equipment Specifications and Requirements • Supply and install free-standing, mains-fed machines at designated locations. • Appearance and functionality must be suitable for high-traffic areas (station/office). • Provision of PAT test certificates and installation records for all machines. • State the energy efficiency rating of the proposed units. • Total care package to include descaling and filter replacement at intervals suitable for hardwater areas. Service intervals to be specified in the Service Level Agreement (SLA). Bottled Water Chillers • Supply bottled water chillers at up to 34 designated sites, as per inventory. • Deliver the required number of bottles during servicing visits; remove and dispose of used bottles in an environmentally responsible manner. • Provide an order process for individual Fire Stations and HQ to reorder directly via telephone or portal, with a capped maximum number per week. • Provide an SLA for servicing, including internal and external cleaning. Mains Water Chillers / Coolers • Supply and install free-standing, mains-fed water chillers as specified in the inventory. • Chillers must dispense both chilled and ambient temperature water. • The body of the chiller shall not be stainless steel; the Contractor must specify available colour/finish options. • Appearance and functionality to be suitable for high-traffic (station/office) environments. • State energy efficiency rating of each proposed unit. • Total care package to include cleaning reports/certificates, PAT testing records, and operative training for cleaning, descaling, and filter replacement at intervals appropriate for hard water areas. Service intervals must be detailed in the SLA. Instant Hot Water Boilers • Supply and install free-standing or wall-mounted hot water boilers as required. • Boilers must be capable of dispensing water at 100°C and accommodate various vessel sizes up to 2 litres. • Contractor to specify the material and available colour/finish options for the boiler body. • Appearance and functionality to be suitable for high-traffic (station/office) environments. • State energy efficiency rating of each proposed unit. • Total care package to include cleaning of exterior, descaling, and filter replacement, with service intervals confirmed in the SLA, appropriate for hard water areas. Maintenance and Compliance • Contractor to perform scheduled and reactive maintenance, ensuring all equipment remains fully operational and compliant with statutory requirements. • Provide all necessary PAT testing records and maintenance certificates. • Include training for RBFRS staff responsible for equipment cleaning and routine maintenance. Environmental Considerations • Contractor must demonstrate environmentally responsible practices for supply, disposal, and recycling of consumables and equipment. Service Level Agreement (SLA) • The Contractor shall provide a detailed SLA outlining all service intervals, response times, and performance standards for all equipment and services supplied under this contract Mobilisation • Prior to the commencement of the contract, the appointed contractor shall develop and execute a comprehensive mobilisation plan. This will include conducting site visits to perform assessment surveys of existing equipment. The assessment must verify the correct placement of units, evaluate the feasibility of transitioning from bottled water to a mains-fed cooling system, and incorporate any additional hot and cold-water points as directed by the relevant authority

Buyer
Royal Berkshire Fire Authority
Contract Value
Value not disclosed
Deadline
No deadline set
Published
11 Mar 2026
Interactive

About This Royal Berkshire Fire Authority Contract

This award stage contract from Royal Berkshire Fire Authority was published in 2026. The Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler contract.

This UK government contract opportunity is part of the public procurement process, openly available via Find a Tender.

Contract Analytics

Key Metrics

0Match
0%
Match
50%
Urgency
30%
Value

Sector Distribution

General100%

Contract Timeline

11 Mar

Published

Current

Award Phase

Value Analysis

Contract value not disclosed

Market Activity

-23%

UK tender activity (12 months)

Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler - Scope of Work

0 phases • 0 requirements • 1 capabilities

Required Capabilities

compliance
  • Suppliers will be required to provide the following services in a cost-effective structure:
  • General Requirements
  • The Contractor shall supply, install, and maintain all specified equipment at RBFRS locations.
  • Provision for leasing options, enabling RBFRS to forecast costs, maintain budget compliance, and upgrade or alter equipment in line with operational requirements.
  • All equipment shall operate from a standard 13-amp power supply, with electrical connections located within 1 metre, and water/drainage connections within 15 metres of installation points.
  • The Contractor shall provide a fixed monthly price for all services and assets supplied under this contract Equipment Specifications and Requirements
  • Supply and install free-standing, mains-fed machines at designated locations.
  • Appearance and functionality must be suitable for high-traffic areas (station/office).
  • Provision of PAT test certificates and installation records for all machines.
  • State the energy efficiency rating of the proposed units.
  • Total care package to include descaling and filter replacement at intervals suitable for hardwater areas.
  • Service intervals to be specified in the Service Level Agreement (SLA).
  • Bottled Water Chillers
  • Supply bottled water chillers at up to 34 designated sites, as per inventory.
  • Deliver the required number of bottles during servicing visits; remove and dispose of used bottles in an environmentally responsible manner.
  • Provide an order process for individual Fire Stations and HQ to reorder directly via telephone or portal, with a capped maximum number per week.
  • Provide an SLA for servicing, including internal and external cleaning.
  • Mains Water Chillers / Coolers
  • Supply and install free-standing, mains-fed water chillers as specified in the inventory.
  • Chillers must dispense both chilled and ambient temperature water.
  • The body of the chiller shall not be stainless steel; the Contractor must specify available colour/finish options.
  • Appearance and functionality to be suitable for high-traffic (station/office) environments.
  • State energy efficiency rating of each proposed unit.
  • Total care package to include cleaning reports/certificates, PAT testing records, and operative training for cleaning, descaling, and filter replacement at intervals appropriate for hard water
  • areas. Service intervals must be detailed in the SLA.
  • Instant Hot Water Boilers
  • Supply and install free-standing or wall-mounted hot water boilers as required.
  • Boilers must be capable of dispensing water at 100°C and accommodate various vessel sizes up to 2 litres.
  • Contractor to specify the material and available colour/finish options for the boiler body.
  • Appearance and functionality to be suitable for high-traffic (station/office) environments.
  • State energy efficiency rating of each proposed unit.
  • Total care package to include cleaning of exterior, descaling, and filter replacement, with service
  • intervals confirmed in the SLA, appropriate for hard water areas.
  • Maintenance and Compliance
  • Contractor to perform scheduled and reactive maintenance, ensuring all equipment remains fully operational and compliant with statutory requirements.
  • Provide all necessary PAT testing records and maintenance certificates.
  • Include training for RBFRS staff responsible for equipment cleaning and routine maintenance.
  • Environmental Considerations
  • Contractor must demonstrate environmentally responsible practices for supply, disposal, and recycling of consumables and equipment.
  • Service Level Agreement (SLA)
  • The Contractor shall provide a detailed SLA outlining all service intervals, response times, and
  • performance standards for all equipment and services supplied under this contract
  • Mobilisation
  • Prior to the commencement of the contract, the appointed contractor shall develop and execute a comprehensive mobilisation plan. This will include conducting site visits to perform assessment surveys of existing equipment. The assessment must verify the correct placement of units, evaluate the feasibility of transitioning from bottled water to a mains-fed cooling system, and incorporate any additional hot and cold-water points as directed by the relevant authority

Ask the AI assistant for deeper analysis of this scope

Contract Value

Fixed PriceSingle contract value agreed upfront
Value not disclosed

Key Dates

Important deadlines and milestones

UK Time

Notice Published

Tender opportunity made public on Find a Tender

Wed, 11 Mar 2026
Passed

What This Royal Berkshire Fire Authority Contract Means

For Citizens

This is a public procurement by Royal Berkshire Fire Authority. All UK government contracts are publicly accessible for transparency.

For Businesses

This Royal Berkshire Fire Authority contract has been awarded. Review for market intelligence.

Related Opportunities

Sector Overview

Buyer Network

Your Match Score

Complete your profile for personalized match scoring

Company Match Analysis

Analyze how well this tender matches your company profile and capabilities.

Market Activity

-43%

UK tender activity (12 months)

Royal Berkshire Fire Authority

Contact Information

View All Contracts
Royal Berkshire Fire Authority
Spending trends, sector breakdown & more →

Quick Facts

Stage
Award
Status
complete
CPV Codes
0

Reference ID

ocds-h6vhtk-0667a5

Win More UK Government Contracts

RFP.quest helps UK businesses find and win public sector tenders. Our AI platform analyzes requirements, identifies gaps, and helps craft winning proposals.

UK tender data from Find a Tender under the Open Government Licence. Powered by RFP.quest.

Tender Assistant

I can help you understand this Royal Berkshire Fire Authority contract:

• Requirements and evaluation criteria • Risks and gaps analysis • Buyer and market context • Related opportunities

Ask me anything about "Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler"!

Powered by CopilotKit