RFP QuestBeta
OpenStage · planning

United Utilities Water Limited

PRO005033-Services-Framework-Combined Heat and Power (CHP) Testing

Engineering & ArchitectureCPV 90731400
ValueValue not published
Deadline
Published2 Dec 2025
RegionNationwide
Who to contact
Jennifer Pike
AMP8Procurements@uuplc.co.uk

The procurement contact named on the official notice.

Match for your company
Sign up free to see how well this tender matches your company — the score, the signals that align, and where the gaps are.
The brief

United Utilities (UU) require point source emissions testing and analysis to be completed at 9 Anaerobic Digestion facilities, located in the North West of England.

The testing is to be carried out annually with the ability to increase this frequency when enhanced monitoring is required on a site-by-site basis.

Testing is required on Combined Heat and Power (CHP) engine exhaust stacks and Boiler exhaust stacks.

Testing may be required on Flare Stacks, should a 10% annual ‘run time’ limit be exceeded.

This would be treated as a reactive issue.

Analysis and methods should fully comply with the requirements of the Environmental Permitting (England & Wales) Regulations 2016 implementing the Industrial Emissions Directive (IED).

The Parameters and Monitoring Standard / Method include: • Oxides of Nitrogen (NO and NO2 expressed as NO2) - BS EN 14792 • Sulphur dioxide - BS EN 14791 or CEN TS 17021 or by calculation based on fuel sulphur • Carbon monoxide - BS EN 15058 • Total VOCs (including methane) - BS EN 12619 • Exhaust gas temperature - Traceable to National Standards • Exhaust gas pressure - Traceable to National Standards • Exhaust gas water vapour content - BS EN 14790-1 -Unless gas is dried before analysis of emissions. • Exhaust gas oxygen - BS EN 14789 • Exhaust gas flow - BS EN 16911-1 The contractor must have the ability to attend site again post survey within a reasonable timeframe to enable a re-test in the event of a result more than the stipulated emission limit.

Operators undertaking the survey must have sufficient competence to undertake surveys safely on active gas and combustion assets.

Operators must adhere to UU permitting and induction requirements.

A UU representative must be available and attend the analysis.

Monitoring equipment, techniques, personnel and organisations shall have either MCERTS certification or MCERTS accreditation.

A report must be provided within a reasonable timeframe that includes methodology, data, results and conclusions.

Conclusions shall clearly indicate if the results are compliant or non-compliant with the sites Environmental Permit emission limits.

The accompanying report must stipulate a calculated ‘methane slip’ and total annual VOC emission.

Contractors undertaking the survey must liaise with UU to arrange visits aligned to a pre agreed annual outage schedule.

This needs to be flexible due to operational constraints.

Contractors may be required to provide temporary access structures.

Key requirements

What the supplier must deliver

01

Testing may be required on Flare Stacks

Testing may be required on Flare Stacks, should a 10% annual ‘run time’ limit be exceeded.

02

Analysis and methods should fully comply

Analysis and methods should fully comply with the requirements of the Environmental Permitting (England & Wales) Regulations 2016 implementing the Industrial Emissions Directive (IED).

03

BS EN 16911-1 The contractor must have

BS EN 16911-1 The contractor must have the ability to attend site again post survey within a reasonable timeframe to enable a re-test in the event of a result more than the stipulated emission limit.

04

Operators undertaking the survey must have sufficient

Operators undertaking the survey must have sufficient competence to undertake surveys safely on active gas and combustion assets.

05

Operators must adhere to UU permitting

Operators must adhere to UU permitting and induction requirements.

Derived from the notice text — always confirm against the original documents.

The gates

What this notice demands of you

1 named in obligation language, 0 mentioned. Each one is quoted from the notice.

Environmental permit / waste carrier licencesays mustRegulator registrations
Conclusions shall clearly indicate if the results are compliant or non-compliant with the sites Environmental Permit emission limits.

Matched against the notice text, so this is a floor — the tender pack will demand things the notice never mentions. “Says must” means the quoted sentence itself used obligation language; anything ambiguous is left as a mention.

Buyer intelligence

Make the case to bid

Reveal who to approach at United Utilities Water Limited, and generate a go-to-market strategy from their news, accounts and people.

Deep dive · beta

The full intelligence dossier

Our agent reads United Utilities Water Limited’s accounts, hunts live signals, finds the people who decide — and hands you a bid strategy plus a go-to-market influence plan, including what your team should post this week. You approve every paid step.

Source & provenance
OCID
ocds-h6vhtk-05ed41
Stage
planning · Planning
Source
Find a Tender
Buyer ref
079047-2025
View the original notice on Find a Tender

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

Market context

Who wins this kind of work

The suppliers and buyers around this opportunity — drawn from official award data. Drag to orbit; click a node to explore.

Top suppliers & buyers in Environment & Waste

Scroll to explore the market network

United Utilities Water Limited’s tender network

Assembling the network…

Also open now

Similar open tenders

Framework Agreement for Pest Control and Environmental Services

Curb Property Maintenance

Closes 11 Sept 2026Environment & Waste
£3.6mValue

Framework Agreement for the Provision of Pest Control Services

Tayside Contracts

Closes 14 Aug 2026Agriculture & Forestry
Value not publishedValue