Skip to main content

Find a Tender · Forecast

Southern Water Services Limited

Southern Water Andover Link Main (ALM) Pipeline Construction & Connection

Forecast · PlanningNo open deadline

Forecast: a planned procurement that is not yet at tender stage.

01/ The notice

Key facts

Value
Not statedValue not stated in source
Deadline (UK time)
No open deadlineA deadline does not apply to this forecast notice.
Published
31 Oct 2025
Region
Not stated

02/ The brief

What the notice says

Not fully read: this is the notice text; attached documents are not read.

The Andover Link Main (ALM) scheme is being delivered by Southern Water Services (SWS) under the Major Projects Directorate. The ALM project is part of the WRMP programme and is associated with SWS’s agreement with the EA under Section 20 of the Water Resources Act 1991 put in place following Public Inquiry to reduce our abstraction licenses for public water supply. Its purpose is to provide environmental protection for the rivers Test and Itchen. The WRMP Programme aims to create greater resilience to water shortages, especially during dry weather and droughts. Existing abstraction licences for the River Test and River Itchen have been substantially reduced through changes required by the Environment Agency to protect the rivers, both designated as Sites of Special Scientific Interest (SSSI), and the River Itchen as Special Area of Conservation (SAC). Additional licence changes will bring further reductions. These rivers are key examples of rare chalk stream habitat which support a wide variety of species. The Proposed Scheme will support environmental improvement by increasing the protection of these rivers while addressing the need for secure water supply.

The ALM scheme involves approximately 25km of below-ground pipeline connecting critical infrastructure between Winchester and Andover, alongside upgrades to existing and new booster stations. It aims to deliver a bi-directional transfer capacity of 15Ml/d by March 2030, ensuring both strategic drought resilience and operational reliability for the isolated Andover Water Resource Zone (WRZ).

SWS delivery strategy is to appoint a single Principal Contractor to design and build Andover Link Main, delivery to inclue detailed design and construction package with enabling work to be completed prior to construction.

The Principal Contractor will act as a Tier 1 provider and sub-contract specialist elements such as Horizontal Directional Drilling (HDD), this strategy is to reduce risk of interdependency issues in construction, testing and commissioning.

We understand the current market status of the Tier 2 requirements including

Civils

Groundworks

Temporary site works

PE Pipe

Pipe fittings

Plant tools and equipment (welding, excavation etc)

Specialist HDD Equipment and Pipe-Jacking Machines

MCCs

Pumps

is stretched as we enter this significant investment period for water and other infrastructure. To support the success of our ALM scheme we are conducting a market engagement exercise that invites the Tier 2 supply chain to register their interest in supporting our Tier 1’s in delivering the scheme

https://southernwater.ukp.app.jaggaer.com/esop/guest/go/opportunity/detail?opportunityId=59781

03/ Classification

CPV codes

Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.

  • 44162500
  • 43300000
  • 45232100
  • 45232150
  • 42131144
  • 31682210
  • 45111200
  • 42122130
  • 44160000
  • 71311100
  • 44100000
  • 45252110
Show the other 2 codes
  • 43130000
  • 44163000

04/ History

Releases of this notice

One release held, oldest first. Dates are UK time.

  1. 31 Oct 2025
    Planning notice

    Planning notice published 31 October 2025.

    Release 070042-2025

    View this release on Find a Tender (opens in a new tab)

05/ Limits

What the source does not tell us

  • The source does not state a usable value.
  • Only one release is held, so there is no change history.

06/ Questions

About this notice

Southern Water Services Limited published this notice.

Value not stated in source.

07/ Tender hubs

More water tenders like this

Pages that list the live notices in the same subject, buyer or place, with recent winners. Chosen by the notice’s current recorded classification or a fixed rule on its title, buyer and region.

08/ Related

Where to go next

These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.

Reference
ocds-h6vhtk-05d7db
Source
Find a Tender
Stage
planning · Planning
Last verified
Fri 3 Apr 2026, 20:33 BST
Read at
Thu 29 Oct 2026, 08:20 GMT

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

RFP Quest logo

Built on published notices from Find a Tender and Contracts Finder.

15 minutes · RFP Quest