Key facts

Value
£3,829,425Estimated value stated in the notice
Deadline (UK time)
Thu 30 Jul 2020, 01:00 BSTA deadline does not apply to this historical notice. The source records Thu 30 Jul 2020, 01:00 BST, which is not an open deadline.
Published
25 Feb 2021
Region
South West

02/ The brief

What the notice says

Not fully read: this is the notice text; attached documents are not read.

Resurfacing of the Main Deck of the Tamar Bridge, including the north and south cantilever lanes. The successfully appointed Contractor will also be required to safely remove the existing installed series of illuminated lane studs and ensure resurfacing work is completed to the agreed programme, to allow for prompt installation of the replacement studs by the separately appointed supplier, as a key part of the overall resurfacing project. There is also the potential scope to include ancillary expansion joint replacement and resurfacing of the Toll Plaza Area.

The value of the Works is estimated to be within the range of £4.5M to £5.3M GBP.

The work is anticipated to take place over a period of up to 6 months, anticipated to commence from April 2021.

The resurfacing overall is concerned with implementing Stage 2 of the current resurfacing strategy and follows on from the resurfacing Stage 1 of the Plymouth side span in 2011. The stage 1 works just replaced the worst section that had failed prematurely, due to onerous loading conditions.

Stage 2 of the resurfacing strategy, which includes the main deck centre span and the Saltash side span and north and south cantilever lanes, was based on a policy of lifetime maximisation of the existing surfacing system until such a point when noticeable and problematic degradation commenced. At the time it was anticipated that the remaining areas would achieve their anticipated design life span in excess of twelve years and at the then anticipated levels of degradation was expected to last for another 3-7 years (2014-2018). It is now the point where the maximum life has been extracted from the remaining surfacing and replacement is required, commencing in Spring 2021.

03/ Classification

CPV codes

Common Procurement Vocabulary codes, exactly as the notice lists them. No descriptions are added here.

  • 45000000 45200000 45230000 45233000
  • 45233223 45233251

04/ History

Releases of this notice

One release held, oldest first. Dates are UK time.

  1. 25 Feb 2021
    Contract notice

    Contract notice published 25 February 2021.

    Release 63cf90f6-b3c3-483e-bb90-002da4d159ef

    View this release on Contracts Finder (opens in a new tab)

05/ Limits

What the source does not tell us

  • Only one release is held, so there is no change history.

06/ Questions

About this notice

Cornwall Council published this notice.

Estimated value stated in the notice: £3,829,425.

07/ Tender hubs

More highway construction tenders like this

This notice is closed and kept here as a record. These pages list the live notices in the same subject, buyer or place. Chosen by the notice’s current recorded classification or a fixed rule on its title, buyer and region.

Open now in Highway construction tenders

08/ Related

Where to go next

These links follow a fixed rule applied to this notice’s buyer, text and CPV codes. They are not advice on whether to bid.

Reference
63cf90f6-b3c3-483e-bb90-002da4d159ef
Source
Contracts Finder
Stage
contract · Contract
Last verified
Wed 8 Apr 2026, 14:21 BST
Read at
Wed 28 Oct 2026, 17:36 GMT

Contains public sector information licensed under the Open Government Licence v3.0. Source data © Crown copyright.

RFP Quest logo

Built on published notices from Find a Tender and Contracts Finder.

15 minutes · RFP Quest

Book a Demo